Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberGRD16-00085
StatusIssued
Name KNIFE RIVER CONSTRUCTION
Site Address 7031 S FEDERAL WAY
Project NameSE BOISE BOAT AND RV STORAGE
Customer NumberDRH16-00446
ePlanReviewYes
Description
(S.E. BOISE BOAT AND RV STORAGE) - Grading permit to pave existing dirt lot, work to include asphalt paving, landscaping, site lighting improvements, parking, drive aisles, and associated site work & storm water management per engineered plans approved by the Public Works Department. No buildings are to be constructed or installed under this permit. See DRH16-00446 for zoning approval/// (KRS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval12/6/201712/6/201712/6/2017 DONE
DetailsTiffany Lowery
GRD-Final11/13/201711/14/201711/14/2017AFAIL
DetailsJim Storey
Keever Phone #: ###-#### plm open bill v to resolve thursday
FIRE-Final Inspection11/13/201711/14/201711/14/2017APART
DetailsTroy Cobbley
Today I viewed/approved the location of the two north most fire hydrants. I noted that there is to be 3'-0" clearance around the fire hydrants. The bollards are currently set around 2'-7" away. Fire dept approval is required or the bollards need to be relocated to comply with the IFC.
Also Scott Arellano has approved the north most fire lanes 2'-0" reduced with per conversation with the engineer.
Keever Phone #: ###-####
Issue PAID IN FULL permit  3/6/2017 DONE
Plan assigned to (CEV) Carlos3/3/2017 3/3/2017 DONE
DetailsCarlos Velazquez
review completed
1st review completed  3/3/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/3/2017 DONE
Permit Ready to Issue  3/3/2017 DONE
Need RP
Plan assigned to Christina2/27/2017 3/3/2017 DEFR
DetailsChristina Prado
Routing - PLAN CHECK2/27/2017 3/3/2017 PASS
DetailsChristina Prado
reviews have been completed
Routing PW Sewer Design2/27/2017 3/3/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage2/27/2017 3/2/2017 PASS
DetailsBrian Murphy
Routing - Addressing2/27/2017 3/1/2017 PASS
DetailsLaura Hunter
Routing PW Street Lights2/27/2017 2/28/2017 PASS
DetailsTom Marshall
Routing PW Sewer Design1/12/2017 2/8/2017 FAIL
DetailsKyle S. Rosenmeyer
Ready to Approve. Re-submit with approved sewer extension drawing.
Routing PW Drainage1/12/2017 1/25/2017 FAIL
NEED NEW GEO-TECH
Routing - Addressing1/12/2017 1/13/2017 FAIL
DetailsLaura Hunter
Must do a parcel consolidation prior to grading
Routing PW Environmental12/1/2016 1/6/2017 PASS
DetailsRick Christenson
On-site inspection for RV dump will be required upon completion.
Routing - PLAN CHECK12/1/2016 1/6/2017 FAIL
DetailsKristal Soland
applicant failed- needs to resubmit- notes in Eplan
Routing PW Sewer Design12/1/2016 12/13/2016 FAIL
DetailsKyle S. Rosenmeyer
Public sewer extension. Failed permit and will review sewer extension under Public Works.
Routing PW Drainage12/1/2016 12/9/2016 FAIL
DetailsBrian Murphy
NEEDS PERC TEST AND APDX J
Routing - Erosion and Sediment12/1/2016 12/5/2016 PASS
DetailsAndy J. Long
ESC plan submitted and approved. Valid Plan Designer. Site preaparation inspection required, call ###-####
Routing - PLANNING Land Div12/1/2016 12/5/2016 PASS
DetailsTodd Tucker
Routing - FIRE12/1/201612/1/201612/2/2016 PASS
DetailsKatie Marron
Plans were reviewed for FD Access and hydrant availability. 5 new hydrants are shown on the drawings. Hydrants shall have steamer connections facing the FD Access, approval subject to satisfactory inspection.
Routing PW Street Lights12/1/2016 12/2/2016 FAIL
DetailsTom Marshall
2 - 30 foot davit pole streetlights with 90 watt class LED and a meter pedestal are required.
Routing - Design Review12/1/2016 12/2/2016 PASS
DetailsJosh Wilson
Application received  12/1/2016 DONE
Application submitted via PDS Online on Dec 1 2016 11:07AM
Plans ACCEPTED BY PLAN TECH  12/1/2016 DONE
DetailsChristina Prado
Intake Approval  12/1/2016 PASS
DetailsKristal Soland
Recd Pcfee & Taken To Pln CK  12/1/2016 DONE
DetailsChristina Prado
Routing - Addressing12/1/2016 12/1/2016 FAIL
DetailsLaura Hunter
Must consolidate both parcels into one via Record of Survey
Routing - PUBLIC WORKS12/1/2016 12/1/2016 PASS
DetailsRachael Beierle
Routing - PLUMBING12/1/2016 12/1/2016 PASS
DetailsBill VanDegrift
dump station to be per ISPC
Plan assigned to (KRS) Kristal12/1/2016   DEFR
DetailsKristal Soland
Routing - PLAN CHECK1/12/2017   FAIL
DetailsKristal Soland
failed Public Works