PubWorks Occupancy Approval | 12/6/2017 | 12/6/2017 | 12/6/2017 | | DONE |
Tiffany Lowery
|
|
|
|
GRD-Final | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | FAIL |
Jim Storey
|
|
|
Keever Phone #: ###-#### plm open bill v to resolve thursday
|
FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Troy Cobbley
|
|
|
Today I viewed/approved the location of the two north most fire hydrants. I noted that there is to be 3'-0" clearance around the fire hydrants. The bollards are currently set around 2'-7" away. Fire dept approval is required or the bollards need to be relocated to comply with the IFC. Also Scott Arellano has approved the north most fire lanes 2'-0" reduced with per conversation with the engineer. Keever Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/6/2017 | | DONE |
|
|
|
|
Plan assigned to (CEV) Carlos | 3/3/2017 | | 3/3/2017 | | DONE |
Carlos Velazquez
|
|
|
review completed
|
1st review completed | | | 3/3/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/3/2017 | | DONE |
|
|
|
Need RP
|
Plan assigned to Christina | 2/27/2017 | | 3/3/2017 | | DEFR |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 2/27/2017 | | 3/3/2017 | | PASS |
Christina Prado
|
|
|
reviews have been completed
|
Routing PW Sewer Design | 2/27/2017 | | 3/3/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 2/27/2017 | | 3/2/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 2/27/2017 | | 3/1/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Street Lights | 2/27/2017 | | 2/28/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 1/12/2017 | | 2/8/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Ready to Approve. Re-submit with approved sewer extension drawing.
|
Routing PW Drainage | 1/12/2017 | | 1/25/2017 | | FAIL |
|
|
|
NEED NEW GEO-TECH
|
Routing - Addressing | 1/12/2017 | | 1/13/2017 | | FAIL |
Laura Hunter
|
|
|
Must do a parcel consolidation prior to grading
|
Routing PW Environmental | 12/1/2016 | | 1/6/2017 | | PASS |
Rick Christenson
|
|
|
On-site inspection for RV dump will be required upon completion.
|
Routing - PLAN CHECK | 12/1/2016 | | 1/6/2017 | | FAIL |
Kristal Soland
|
|
|
applicant failed- needs to resubmit- notes in Eplan
|
Routing PW Sewer Design | 12/1/2016 | | 12/13/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Public sewer extension. Failed permit and will review sewer extension under Public Works.
|
Routing PW Drainage | 12/1/2016 | | 12/9/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS PERC TEST AND APDX J
|
Routing - Erosion and Sediment | 12/1/2016 | | 12/5/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid Plan Designer. Site preaparation inspection required, call ###-####
|
Routing - PLANNING Land Div | 12/1/2016 | | 12/5/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 12/1/2016 | 12/1/2016 | 12/2/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access and hydrant availability. 5 new hydrants are shown on the drawings. Hydrants shall have steamer connections facing the FD Access, approval subject to satisfactory inspection.
|
Routing PW Street Lights | 12/1/2016 | | 12/2/2016 | | FAIL |
Tom Marshall
|
|
|
2 - 30 foot davit pole streetlights with 90 watt class LED and a meter pedestal are required.
|
Routing - Design Review | 12/1/2016 | | 12/2/2016 | | PASS |
Josh Wilson
|
|
|
|
Application received | | | 12/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2016 11:07AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/1/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/1/2016 | | PASS |
Kristal Soland
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/1/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 12/1/2016 | | 12/1/2016 | | FAIL |
Laura Hunter
|
|
|
Must consolidate both parcels into one via Record of Survey
|
Routing - PUBLIC WORKS | 12/1/2016 | | 12/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 12/1/2016 | | 12/1/2016 | | PASS |
Bill VanDegrift
|
|
|
dump station to be per ISPC
|
Plan assigned to (KRS) Kristal | 12/1/2016 | | | | DEFR |
Kristal Soland
|
|
|
|
Routing - PLAN CHECK | 1/12/2017 | | | | FAIL |
Kristal Soland
|
|
|
failed Public Works
|