GRD-Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Jim Storey
|
|
|
Daryl Phone #: ###-####
|
DOC - Permit Finaled | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Jim Storey
|
|
|
Daryl Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/11/2017 | | DONE |
|
|
|
No fees per Christina
|
CHANGE STATUS TO (ISS) | | | 8/11/2017 | | DONE |
|
|
|
|
Plan assigned to Christina | 8/3/2017 | | 8/11/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/3/2017 | | 8/11/2017 | | PASS |
Christina Prado
|
|
|
|
Routing PW Drainage | 8/4/2017 | | 8/11/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 8/4/2017 | | 8/7/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 8/4/2017 | | 8/4/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2017 | | 8/4/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 8/3/2017 | | DONE |
Christina Prado
|
|
|
Plan mod #2 - revise site secondary access from supply way, access narrowed to 20-ft of pavement & provided with a gravel shoulder on south side
|
Routing - PLAN CHECK | 6/28/2017 | | 7/5/2017 | | PASS |
Christina Prado
|
|
|
|
Routing PW Drainage | 6/29/2017 | | 7/5/2017 | | PASS |
Brian Murphy
|
|
|
Per ePlan approval
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod approved, no additional fees due
|
Permit Ready to Issue | | | 7/5/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/5/2017 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/28/2017 | | 6/29/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod accepted for changes to the Storm Drainage system
|
Plan assigned to Christina | 6/28/2017 | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/20/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/10/2017 | | 4/10/2017 | | PASS |
Christina Prado
|
|
|
|
Routing PW Sewer Design | 4/10/2017 | | 4/10/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/10/2017 | | DONE |
|
|
|
**MET** need RP & rev cert of val
|
Plan assigned to Christina | 3/8/2017 | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 4/6/2017 | | FAIL |
Christina Prado
|
|
|
Pending resubmital on Sewer Design only, all other divisions have approved
|
Routing PW Drainage | 3/29/2017 | | 4/6/2017 | | PASS |
Brian Murphy
|
|
|
As Per ePlan Review approval
|
Routing PW Sewer Design | 3/29/2017 | | 4/6/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Add corporation stop and show pipe sizes correctly on detail sheet.
|
Routing PW Solid Waste | 3/29/2017 | | 4/4/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned. Site is approved for compactor service.
|
Routing - FIRE | 3/29/2017 | 3/29/2017 | 3/31/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Street Lights | 3/29/2017 | | 3/30/2017 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 3/29/2017 | | DONE |
Christina Prado
|
|
|
Resubmittals received for Fire, Drainage, Solid Waste & Sewer Design corrections
|
Routing PW Solid Waste | 3/8/2017 | | 3/22/2017 | | FAIL |
Evan Carpenter
|
|
|
Need enclosure(s) for solid waste. No enclosures indicated on site plans.
|
Routing - PLAN CHECK | 3/8/2017 | | 3/22/2017 | | FAIL |
Christina Prado
|
|
|
Pending re-submittal for PW & Fire approval
|
Routing PW Drainage | 3/8/2017 | | 3/14/2017 | | FAIL |
Brian Murphy
|
|
|
need 3 to 1 sideslopes apdx j
|
Routing - PLANNING Land Div | 3/8/2017 | | 3/13/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 3/8/2017 | 3/8/2017 | 3/9/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 3/8/2017 | | 3/9/2017 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid PD, need to desiganted RP. Pre-construction Site Preparation inspection required, call ###-####
|
Routing PW Sewer Design | 3/8/2017 | | 3/9/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Install Coroporation Stop immediatly upstream of tapping saddle, on service line. Record Drawings indicate that existing force main is 2.5" in diameter.
|
Routing PW Street Lights | 3/8/2017 | | 3/9/2017 | | FAIL |
Tom Marshall
|
|
|
|
Application received | | | 3/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2017 9:08AM
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/8/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/8/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLUMBING | 3/8/2017 | | 3/8/2017 | | PASS |
Bill VanDegrift
|
|
|
pressure sewer cleanout required
|
Routing - Design Review | 3/8/2017 | | 3/8/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 3/8/2017 | | 3/8/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2017 | | 3/8/2017 | | PASS |
Morgan Webb
|
|
|
|