FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
Plan Reviewer's activity | | | 8/31/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
per Celine okay to remove parking of hydrant
|
FIRE-Final Inspection | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the fire hydrant issue is addressed. The issue is that there is currently marked parking in front of the fire hydrant. This parking needs to be designated no parking but needs to be approved by the Planning dept.
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
GRD-Final | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 8/29/2018 | 8/29/2018 | 8/29/2018 | | DONE |
Tiffany Lowery
|
|
|
|
GRD-Grading Inspection | 10/22/2017 | 10/23/2017 | 10/23/2017 | A | CANC |
Dan Ediger
|
|
|
SHOULD HAVE BEEN CALLED ON THE PLUMBING PERMIT PLM17-03869 Jim Wellman
Requesting an inspection for 1500 gallon grease interceptor. Not sure what type of inspection is needed. I talked to Dan Ediger Plumbing inspector looked at it and need him to re-inspect tank. Phone #: ###-#### >> Inspection requested via web by Jim Wellman
|
GRD-Conference | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Mike Jordan
|
|
|
Jim Wellman Phone #: ###-####. Footing and stemwall for trash enclosure.
|
Inspection Record Card-GRD | | | 10/4/2017 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 7/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/21/2017 | | DONE |
|
|
|
|
Plan assigned to Christina | 6/2/2017 | | 7/18/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/2/2017 | | 7/18/2017 | | PASS |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 6/2/2017 | | 7/18/2017 | | PASS |
Christina Prado
|
|
|
Per ePlan approval
|
Routing PW Grading-Hillside | 7/18/2017 | | 7/18/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - Design Review | 7/18/2017 | | 7/18/2017 | | PASS |
Katelyn Menuge
|
|
|
Per DRH17-00258
|
Routing PW Drainage | 7/18/2017 | | 7/18/2017 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/18/2017 | | DONE |
Christina Prado
|
|
|
All met 7/19/17 C_P /// Need revised cert of value and GC form
|
Routing - Design Review | 7/7/2017 | | 7/7/2017 | | FAIL |
Katelyn Menuge
|
|
|
Need updated site and landscape plans, matching those approved through DRH17-00258. Appeal period ends 7-17-17.
|
Routing PW Street Lights | 6/2/2017 | | 7/6/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Grading-Hillside | 6/2/2017 | | 6/9/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need P&Z hillside application (#114) before grading permit can be processed. Jason Taylor ###-####.
|
Routing - FIRE | 6/2/2017 | 6/2/2017 | 6/5/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 6/2/2017 | | 6/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid RP designated. Site preparation inspection required, call ###-#### to schedule
|
Routing - PLANNING Land Div | 6/2/2017 | | 6/2/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 6/2/2017 | | 6/2/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 6/2/2017 | | 6/2/2017 | | FAIL |
Katelyn Menuge
|
|
|
Need Design Review Submittal and Approval prior.
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/2/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2017 10:13AM
|
Intake Approval | | | 5/26/2017 | | FAIL |
Christina Prado
|
|
|
see failed checklist uploaded into ePlanReview
|