GRD-Final | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | DEFR |
Mike Jordan
|
|
|
Permit needs to be closed. Final Occupancy given on main permit BLD17-02871. Jason Taylor from public works to review and final GRD permit.
|
Issue PAID IN FULL permit | | | 7/17/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2017 | | DONE |
|
|
|
Need RP only 7-12-17 /// need GC, rev cert of val & RP
|
Plan assigned to (CAN) Candy | 6/16/2017 | | 7/10/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | 6/16/2017 | | 7/10/2017 | | PASS |
Candy A. Nichols
|
|
|
|
Routing PW Drainage | 6/26/2017 | | 7/10/2017 | | PASS |
Brian Murphy
|
|
|
as per e plan-Brian approved plan review
|
Routing PW Sewer Design | 6/26/2017 | | 7/7/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 7/6/2017 | | 7/7/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - FIRE | 7/6/2017 | 7/6/2017 | 7/6/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Sewer Design | 6/19/2017 | | 6/26/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Existing 4" service does not exist at this location. A 4" service was installed approximatley 240' north of this location. Sewer infrastructure does not exist south of the Cimarron Apartments in Bird St. The extension of the sewer is under review by Boise Public Works.
|
Routing PW Drainage | 6/19/2017 | | 6/26/2017 | | FAIL |
Brian Murphy
|
|
|
need m well detail
|
Routing PW Environmental | 6/19/2017 | | 6/23/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 6/19/2017 | | 6/21/2017 | | FAIL |
|
|
|
The solid waste enclosure must have at least 18 ft of unobstructed clearance between outer gate posts; suggest removal of center partition.
There needs to be 50’ of clearance in front of the enclosure gate to ensure that the dumpster can be serviced properly.
|
Routing - PLANNING Land Div | 6/16/2017 | | 6/21/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 6/16/2017 | 6/16/2017 | 6/19/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Design Review | 6/16/2017 | | 6/19/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Erosion and Sediment | 6/16/2017 | | 6/19/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved. RP TBD.
|
Routing - Addressing | 6/16/2017 | | 6/19/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/16/2017 | | 6/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 6/19/2017 | | 6/19/2017 | | PASS |
Tom Marshall
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/16/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/16/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/16/2017 | | DONE |
|
|
|
|
Application received | | | 6/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 14 2017 1:36PM
|