GRD-Final | 4/3/2018 | 4/4/2018 | 4/3/2018 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
GRD-Final | 2/26/2018 | 2/26/2018 | 2/26/2018 | A | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 2/26/2018 | 2/26/2018 | 2/26/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Plan assigned to (BLH)Brittany | 10/17/2017 | | 10/17/2017 | | DONE |
Brittany Hill
|
|
|
|
Routing - Design Review | 10/17/2017 | | 10/17/2017 | | PASS |
Andrea Tuning
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2017 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 9/6/2017 | | DONE |
|
|
|
|
Plan assigned to (BLH)Brittany | 8/24/2017 | | 9/5/2017 | | DONE |
Brittany Hill
|
|
|
|
Routing - PLAN CHECK | 8/24/2017 | | 9/5/2017 | | PASS |
Brittany Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/5/2017 | | DONE |
Christina Prado
|
|
|
ALL MET Need:
RP
MET GC Form
Revised Certificate of Value
|
Routing - FIRE | 8/24/2017 | 8/24/2017 | 9/1/2017 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. Existing Fire Access Roadways can service the proposed new structure and shall be maintained as originally approved. One existing Fire hydrant is available for use and within 400 lineal feet of the proposed structure.
|
Routing PW Sewer Design | 8/24/2017 | | 8/31/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Erosion and Sediment | 8/24/2017 | | 8/29/2017 | | PASS |
Andy J. Long
|
|
|
building permit submittal BLD17-02294
|
Routing PW Drainage | 8/24/2017 | | 8/28/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 8/24/2017 | | 8/25/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING Land Div | 8/24/2017 | | 8/25/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 8/24/2017 | | 8/24/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/24/2017 | | 8/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 8/24/2017 | | 8/24/2017 | | PASS |
Brent Moore
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/24/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/24/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/24/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/23/2017 | | FAIL |
|
|
|
Spoke with Terrry informing him that he needs to add on the plans where fire hyrants are and his letter from Suez needs to have the correct address.
|
Intake Approval | | | 7/28/2017 | | FAIL |
|
|
|
Please upload the following documents: Form 304, Specification Books, Site Drainage Report(stamped and sign by Idaho licensed design professional), Drainage System Operation & Maintenance Plan(stamped and sign by Idaho licensed design professional, Erosion & Sediment Control Narrative. Also please show on your site plan designating fire hydrants (new and existing)
|
Application received | | | 7/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2017 2:26PM
|