FIRE-Final Inspection | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection for scope of work complete.
Jessie Phone #: ###-####
|
GRD-Final | 10/7/2019 | 10/8/2019 | 10/7/2019 | A | PASS |
Dave Hannah
|
|
|
Jessie Phone #: ###-####
|
PubWorks Occupancy Approval | 10/7/2019 | 10/7/2019 | 10/7/2019 | | DONE |
Jason C. Taylor
|
|
|
|
Telephone call | | | 3/30/2018 | | DONE |
|
|
|
Left a message for Tyler informing him that this permit is now 12 days past the expiration date. Informed that if they are not ready to pick the permit they are welcome to send in a request for a 180 day extension (left info)
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|
Meeting | | | 1/3/2018 | | DONE |
|
|
|
Sent an email to Joshua to touch bases on how he would like to continue with this permit since it will expire 3-18-18
|
Routing PW Environmental | 10/17/2017 | | 11/3/2017 | | PASS |
Rick Christenson
|
|
|
Changes have been made and resubmitted.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 11/3/2017 | | DONE |
Christina Prado
|
|
|
Need
RP (one given expired) - MET
GC Form - MET
Revised Cert of Value - MET
|
Plan assigned to Christina | 9/27/2017 | | 11/3/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 10/17/2017 | | 10/17/2017 | | PASS |
Morgan Webb
|
|
|
ROUTED TO ENVIRONMENTAL
|
Routing PW Sewer Design | 9/27/2017 | | 10/5/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to existing services installed under phase 1.
|
Routing - FIRE | 9/27/2017 | 9/27/2017 | 10/4/2017 | | PASS |
Scott Arellano
|
|
|
No separate comments attached to this case.
|
Routing - Erosion and Sediment | 9/27/2017 | | 10/2/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map submitted and approved. Certified RP and PD designated. Site preparation inspection required. Inspector shall close out phase I ESC permit once this permit is active.
|
Routing - PLUMBING | 9/27/2017 | | 10/2/2017 | | PASS |
Bill VanDegrift
|
|
|
1) vent vapor chamber on flammible liquids interceptor
2) 4" drain in mechanical room for rp discharge required
|
Routing - Design Review | 9/27/2017 | | 9/29/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 9/27/2017 | | 9/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Environmental | 9/27/2017 | | 9/28/2017 | | FAIL |
Rick Christenson
|
|
|
Trash Corral drains need to be connected to FL-1 interceptor
|
Routing PW Street Lights | 9/27/2017 | | 9/28/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 9/27/2017 | | 9/28/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Solid Waste | 9/27/2017 | | 9/27/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Addressing | 9/27/2017 | | 9/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 9/27/2017 | | 9/27/2017 | | PASS |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2017 | | DONE |
|
|
|
|
Application received | | | 9/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2017 8:46AM
|