GRD-Final | 5/24/2018 | 5/24/2018 | 5/24/2018 | A | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 5/24/2018 | 5/24/2018 | 5/24/2018 | | DONE |
Tiffany Lowery
|
|
|
|
GRD-Final | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Mike Jordan
|
|
|
Shane (alt. contact is Kyle ###-####) Phone #: ###-####
|
GRD-Final | 5/15/2018 | 5/21/2018 | 5/21/2018 | P | NR |
Mike Jordan
|
|
|
Kyle Phone #: ###-####. Needs ESC and public works finals.
|
Issue PAID IN FULL permit | | | 2/15/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 2/15/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 2/15/2018 | | DONE |
|
|
|
|
Routing - FIRE | 1/29/2018 | 1/29/2018 | 2/5/2018 | | PASS |
Erika Akin
|
|
|
No structures or access issues. No fire life safety inspection is required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2018 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/5/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED CERT
|
Plan assigned to Christina | 1/3/2018 | | 2/5/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 1/29/2018 | | 1/29/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00542
|
Routing - FRONT DESK | 1/3/2018 | | 1/29/2018 | | PASS |
Christina Prado
|
|
|
|
Routing PW Sewer Design | 1/3/2018 | | 1/11/2018 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Drainage | 1/3/2018 | | 1/10/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 1/3/2018 | | 1/4/2018 | | FAIL |
Andrea Tuning
|
|
|
Gravel, rock, or cobble on the surface of swales shall not exceed 20 percent of the surface area of the bottom of the swale.
The storm water swale shall be vegetated with appropriate plant materials. Plant materials shall be a species that are able to withstand the anticipated changes in soil wetness and moisture levels.
|
Routing - Addressing | 1/3/2018 | | 1/3/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/3/2018 | | 1/3/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 1/3/2018 | | 1/3/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan/SWPPP approved. Certified stormwater team designated. Site preparation inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 1/3/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/3/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2018 | | DONE |
|
|
|
|
Application received | | | 12/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 29 2017 10:04AM
|