Permit Information
Permit NumberGRD17-00089
StatusFinaled
Name KNIFE RIVER CORPORATION NORTHWEST
Site Address 11350 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewYes
Description
(IDAHO POWER) This phase of the project includes striping of topsoil within the area to receive new fill. Additional excavation will occur in areas in order to meet the proposed finish grade with the addition of 32 inch thick gravel section. Construction of a infiltration basin in the northwest corner of the site to infiltrate site runoff. A swale along the north side of the site to collect and convey runoff to the infiltration basin. A infiltration swale on the west side of the site to collect runoff from the training area to convey the runoff to the infiltration basin.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GRD-Final5/24/20185/24/20185/24/2018ADONE
DetailsTiffany Lowery
PubWorks Occupancy Approval5/24/20185/24/20185/24/2018 DONE
DetailsTiffany Lowery
GRD-Final5/23/20185/23/20185/23/2018PPASS
DetailsMike Jordan
Shane (alt. contact is Kyle ###-####) Phone #: ###-####
GRD-Final5/15/20185/21/20185/21/2018PNR
DetailsMike Jordan
Kyle Phone #: ###-####. Needs ESC and public works finals.
Issue PAID IN FULL permit  2/15/2018 DONE
Inspection Record Card-GRD  2/15/2018 DONE
Inspection Record Card-GRD  2/15/2018 DONE
Routing - FIRE1/29/20181/29/20182/5/2018 PASS
DetailsErika Akin
No structures or access issues. No fire life safety inspection is required.
PLANS/APPL TAKEN TO FRONT DESK  2/5/2018 DONE
DetailsChristina Prado
Permit Ready to Issue  2/5/2018 DONE
NEED
GC FORM
REVISED CERT
Plan assigned to Christina1/3/2018 2/5/2018 DONE
DetailsChristina Prado
Routing - PLANNING1/29/2018 1/29/2018 PASS
DetailsKatelyn Menuge
DRH17-00542
Routing - FRONT DESK1/3/2018 1/29/2018 PASS
DetailsChristina Prado
Routing PW Sewer Design1/3/2018 1/11/2018 PASS
DetailsMike Sheppard
Routing PW Drainage1/3/2018 1/10/2018 PASS
DetailsBrian Murphy
Routing - PLANNING1/3/2018 1/4/2018 FAIL
DetailsAndrea Tuning
Gravel, rock, or cobble on the surface of swales shall not exceed 20 percent of the surface area of the bottom of the swale.
The storm water swale shall be vegetated with appropriate plant materials. Plant materials shall be a species that are able to withstand the anticipated changes in soil wetness and moisture levels.
Routing - Addressing1/3/2018 1/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/3/2018 1/3/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/3/2018 1/3/2018 PASS
DetailsAndy J. Long
ESC plan/SWPPP approved. Certified stormwater team designated. Site preparation inspection required.
Plans ACCEPTED BY PLAN TECH  1/3/2018 DONE
Intake Approval  1/3/2018 PASS
Recd Pcfee & Taken To Pln CK  1/3/2018 DONE
Application received  12/29/2017 DONE
Application submitted via PDS Online on Dec 29 2017 10:04AM