Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberGRD18-00017
StatusIssued
Name CONCAR INC
Site Address 182 E SHERMAN ST
Project NameFullmer residence
Customer NumberCFH17-00072
ePlanReviewYes
Description
****GRADING ONLY**** NO VERTICAL CONSTRUCTION, FOOTINGS, OR WALLS ALLOWED UNDER THIS PERMIT (GRADING PERMIT - HILLSIDE RESIDENTIAL) To conduct excavation of approximately 4780 cubic yards of earth in the site preparation for a future single family dwelling to be constructed under BLD18-00592 as approved by the City of Boise, Public Works Department. No building construction is allowed under this permit. ESC18-00264 is to be issued with this permit. (C_P)


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Reopen Permit (ISS)  4/17/2019 DONE
still need final inspection with bld inspector
GRD-Final12/18/201812/19/201812/19/2018ADONE
DetailsBrandon Shaw
Jeff Phone #: ###-####
PubWorks Occupancy Approval12/18/201812/18/201812/18/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading is acceptable has been received by Public Works. Melissa Jannusch ###-####. A bond for the sites re-vegetation has been received by Public Works and is listed under the building permit. The grading permit may be finaled be the building department. Melissa Jannusch ###-####

CHANGE STATUS TO (ISS)  6/1/2018 DONE
Previously issued
CHANGE STATUS TO (RDY)  5/17/2018 DONE
DO NOT ISSUE. ISSUED BY MISTAKE (CHANGE EXPIRATION DATE WHEN ISSUED ON CORRECT DAY)
Routing PW Grading-Hillside2/28/2018 2/28/2018 PASS
DetailsMelissa Jannusch



A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

PLANS/APPL TAKEN TO FRONT DESK  2/28/2018 DONE
DetailsChristina Prado
Permit Ready to Issue  2/28/2018 DONE
Need
GC Form
Issue PAID IN FULL permit  2/28/2018 DONE
Plan assigned to Christina2/22/2018 2/28/2018 DONE
DetailsChristina Prado
Routing - PLANNING2/22/2018 2/23/2018 PASS
DetailsDavid Moser
CFH17-00072
Routing - Erosion and Sediment2/22/2018 2/23/2018 PASS
DetailsAndy J. Long
Routing PW Grading-Hillside2/22/2018 2/23/2018 FAIL
DetailsMelissa Jannusch
See changmarks in ePlan
Provide most recent grading plan
Add conclusion to geotech report
Routing - PUBLIC WORKS2/22/2018 2/22/2018 PASS
DetailsMorgan Webb
Routing - FRONT DESK2/22/2018 2/22/2018 PASS
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  2/22/2018 DONE
Intake Approval  2/22/2018 PASS
Recd Pcfee & Taken To Pln CK  2/22/2018 DONE
Application received  2/20/2018 DONE
Application submitted via PDS Online on Feb 20 2018 8:27PM