GRD-Final | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
Zoning Approval Temp | 7/9/2018 | 7/9/2018 | 7/9/2018 | | PASS |
Katelyn Menuge
|
|
|
Two year temporary approval.
|
PubWorks Occupancy Approval | 6/27/2018 | 6/27/2018 | 6/27/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 5/23/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 5/23/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2018 | | DONE |
|
|
|
need
GC - met
Rev Cert of Val-met
bobbychristensen@engineerconstruction.inc
|
Plan assigned to (LEG) Tisha | 4/4/2018 | | 5/22/2018 | | DONE |
Tisha Gallop
|
|
|
saltbox parking lot
|
Plan resubmittals received | | | 5/21/2018 | | |
|
|
|
|
Routing - Design Review | 5/21/2018 | | 5/21/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00112
|
Routing - FRONT DESK | 5/21/2018 | | 5/21/2018 | | PASS |
Tisha Gallop
|
|
|
|
Routing - Design Review | 5/3/2018 | | 5/14/2018 | | FAIL |
Katelyn Menuge
|
|
|
Need to complete bonding.
|
Routing PW Street Lights | 5/3/2018 | | 5/8/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 5/3/2018 | | 5/4/2018 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 5/3/2018 | | DONE |
|
|
|
|
Routing - FIRE | 4/4/2018 | 4/4/2018 | 4/11/2018 | | PASS |
Erika Akin
|
|
|
No fire life safety inspection required
|
1st review completed | | | 4/11/2018 | | FAIL |
|
|
|
Pending approvals by Design Reveiw, Drainage, Street Lights
|
Routing - FRONT DESK | 4/4/2018 | | 4/11/2018 | | PASS |
Tisha Gallop
|
|
|
Pending approvals by Design Reveiw, Drainage, Street Lights
|
Routing - Erosion and Sediment | 4/4/2018 | | 4/10/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Double fee applied for starting without permits.
|
Routing PW Street Lights | 4/5/2018 | | 4/6/2018 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Drainage | 4/5/2018 | | 4/5/2018 | | FAIL |
Brian Murphy
|
|
|
need apdx J and 3 to 1 swale slope
|
Routing - PLANNING | 4/4/2018 | | 4/5/2018 | | FAIL |
Katelyn Menuge
|
|
|
The following is required prior to grading permit issuance-
Bond for removal of the temporary parking lot.
Obtain Ada County Highway District approval for work in the Right-Of-Way.
Obtain Boise Community Forestry approval for trees in the Right-Of-Way.
Work with Public Works on Historic Street Light placement along 5th Street.
Provide interior pole lighting with fixture specifications and photometric plan.
Revise the site plan to comply with setbacks.
Comply with all other conditions of the Design Review approval letter.
|
Routing - Addressing | 4/4/2018 | | 4/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/4/2018 | | 4/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 4/4/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/4/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/23/2018 | | FAIL |
|
|
|
1. Planning and Zoning approval must be approved prior to submitting for grading and erosion permit.
2. Please specify aggregate material on plans.
3. Please provide Drainage Report.
4. Please provide Geotechnical Report.
5. Please provide O & M (Operation & Maintenance) Plan.
6. Please provide Boise City form #304 (Registered Design Professional) https://pds.cityofboise.org/home/documents/apps/300/
|
Application received | | | 3/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2018 4:27PM
|