GRD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Dave Hannah
|
|
|
check PW inspection is in system // brandon Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/11/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 4/11/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2018 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/10/2018 | | DONE |
|
|
|
Met
|
Plan assigned to Christina | 4/9/2018 | | 4/10/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 4/9/2018 | | 4/10/2018 | | PASS |
Andy J. Long
|
|
|
ESC reviewed under BLD17-03885, approved to be issued with GRD18-00031. ESC site preparation inspeciton is required.
|
Routing PW Drainage | 4/9/2018 | | 4/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2018 | | DONE |
|
|
|
|
Routing - FRONT DESK | 4/9/2018 | | 4/9/2018 | | PASS |
Christina Prado
|
|
|
|
Routing - PLANNING | 4/9/2018 | | 4/9/2018 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 4/9/2018 | | 4/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/9/2018 | | 4/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 4/9/2018 | | | |
|
|
|
|