Reopen Permit (ISS) | | | 4/17/2019 | | DONE |
|
|
|
showing no PW inpsection and final show NR as of 10-10-18
|
FIRE-Final Inspection | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Plan review approved gravel fire dept access roadway
John Phone #: ###-####
|
GRD-Final | 10/5/2018 | 10/9/2018 | 10/10/2018 | P | NR |
Jim Sly
|
|
|
John Phone #: ###-####-can you please call to meet Called John. Need Fire, Public works.........Electrical Permit and final approval.
|
Inspection Record Card-GRD | | | 10/5/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2018 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
|
|
|
All Requirements Met
|
Issue PAID IN FULL permit | | | 4/20/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 4/20/2018 | | DONE |
|
|
|
|
Plan assigned to Christina | 4/13/2018 | | 4/20/2018 | | DONE |
Christina Prado
|
|
|
|
Routing PW Solid Waste | 4/16/2018 | | 4/19/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - FIRE | 4/13/2018 | 4/13/2018 | 4/17/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Inspector to field verify signage along FD access in compliance with BMC 7-01-32
|
Routing - Erosion and Sediment | 4/13/2018 | | 4/17/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - PLANNING | 4/13/2018 | | 4/16/2018 | | PASS |
Celine Acord
|
|
|
per CUP18-00020
|
Routing - Addressing | 4/13/2018 | | 4/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2018 | | 4/16/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 4/16/2018 | | 4/16/2018 | | FAIL |
Brian Murphy
|
|
|
NO DRAINAGE TO ACHD SITE
|
Routing - FRONT DESK | 4/13/2018 | | 4/13/2018 | | PASS |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2018 | | DONE |
|
|
|
|
Application received | | | 4/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 11 2018 6:11PM
|