FIRE-Final Inspection | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | PASS |
Jim Page
|
|
|
Fire life safety inspection for grading permit is complete, per conversation with Ron Johnson with Boise Fire, fire hydrant on east side of building next to trash enclosure will be accepted at currenty location. Man-gate provided at north fire hydrant closest to building.
Nacho Phone #: ###-####
|
GRD-Final | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | CANC |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
Override - Parcel Holds | 12/11/2019 | 1/1/1900 | 12/11/2019 | | |
|
|
|
geotechnical report provided
|
GRD-Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | CANC |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
Override - Parcel Holds | 12/3/2019 | 1/1/1900 | 12/3/2019 | | |
|
|
|
.
|
Routing - PLUMBING | 7/3/2018 | | 7/10/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FRONT DESK | 7/10/2018 | | 7/10/2018 | | PASS |
Tiffany Carson-Herker
|
|
|
|
Routing PW Drainage | 7/10/2018 | | 7/10/2018 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/10/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
(jdowalter@k2cm.com)
|
Issue PAID IN FULL permit | | | 7/10/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 7/10/2018 | | DONE |
|
|
|
|
Plan assigned to (TCH) TIffany | 6/13/2018 | | 7/10/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Routing PW Drainage | 7/3/2018 | | 7/6/2018 | | PASS |
Brian Murphy
|
|
|
existing system new o/s
|
Routing - FIRE | 7/3/2018 | 7/3/2018 | 7/5/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Sewer Design | 7/3/2018 | | 7/3/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 7/3/2018 | | 7/3/2018 | | PASS |
Katelyn Menuge
|
|
|
Received all required documents.
|
Routing - FIRE | 6/13/2018 | 6/13/2018 | 6/26/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - FRONT DESK | 6/13/2018 | | 6/26/2018 | | FAIL |
Tiffany Carson-Herker
|
|
|
failed due to design review, fire review, plumbing review, PW drainage review and sewer design review.
|
Routing - PLANNING | 6/13/2018 | | 6/26/2018 | | PASS |
Brent Moore
|
|
|
|
Routing PW Street Lights | 6/13/2018 | | 6/21/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 6/13/2018 | | 6/18/2018 | | FAIL |
DeAnn Brown
|
|
|
Please revise sewer per changemarks on utility plan sheet in eplanreview.
|
Routing PW Environmental | 6/13/2018 | | 6/15/2018 | | PASS |
Rick Christenson
|
|
|
Per pumbling approval.
|
Routing - Design Review | 6/13/2018 | | 6/14/2018 | | FAIL |
Katelyn Menuge
|
|
|
Administrative approval of shared parking agreement and parcel consolidation shall be approved prior to grading, paving and other proposed work on the site.
|
Routing - Addressing | 6/13/2018 | | 6/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/13/2018 | | 6/13/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/13/2018 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 6/13/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2018 | | DONE |
|
|
|
ESC case paid for
|
Routing - Erosion and Sediment | 6/13/2018 | | 6/13/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed prior to ground disturbance.
|
Routing - PLUMBING | 6/13/2018 | | 6/13/2018 | | FAIL |
Bill VanDegrift
|
|
|
no wastes other than those needing treatment shall discharge into an interceptor.
|
Intake Approval | | | 5/22/2018 | | FAIL |
|
|
|
1. Soils and geotechnical report.
2. site drainage report.
3. drainage system operation & maintenance plan.
4. wait for the ROS18-00043 has been recorded.
|
Application received | | | 5/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2018 8:54AM
|
Routing PW Drainage | 6/13/2018 | | | | FAIL |
Jason C. Taylor
|
|
|
routed per request by pds to jct NEED APDX J AND O/S TRAP
|