Permit Information
Permit NumberGRD18-00044
StatusFinaled
Name GUHO CORP
Site Address 1172 W RIVER ST
Project NameRiver Street
Customer Number 
ePlanReviewNo
Description
(PROJECT MANAGEMENT / RON HILL) (RIVER STREET - STREETSCAPE IMPROVEMENTS) (DRH18-00060)Permit for streetscape improvements along River Street between South Ash St. to South 12th St. Work to include sidewalk, curb and gutter, existing approaches, landscaping, relocation of traffic control sign and irrigation pedestal. All work is to be done according to engineered plans as approved by Public Works Department. Separate electrical permit is required. No buildings are to be constructed or installed under this permit. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GRD-Final12/7/201812/7/201812/12/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Rob Cloninger
Issue PAID IN FULL permit  11/28/2018 DONE
Telephone call  11/26/2018 DONE
spoke with christopher informing him that this permit is going to expire in 8 days. stated he will send over the 302 and 306 forms
Routing - FRONT DESK7/19/2018 7/23/2018 PASS
DetailsChristina Prado
Plan assigned to Christina7/23/2018 7/23/2018 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  7/23/2018 DONE
Inspection Record Card-GRD  7/23/2018 DONE
Permit Ready to Issue  7/23/2018 DONE
Need:- All Met
RP

met christopher@thelandgroupinc.com
GC
Revised Value
plans are in the misc. draw
Telephone call  7/23/2018 DONE
called Denise to let know permit is ready and that we need the RP, GC and rev cert of val-left message on her phone
Plan assigned to (LEG) Tisha6/6/2018 7/23/2018 DEFR
DetailsTisha Gallop
Routing PW Street Lights7/19/2018 7/20/2018 PASS
DetailsTom Marshall
Routing - PLANNING7/19/2018 7/20/2018 PASS
DetailsZachary Piepmeyer
Routing - PUBLIC WORKS7/20/2018 7/20/2018 PASS
DetailsMorgan Webb
Plan resubmittals received  7/19/2018 DONE
Received two full sets of plans. Inserted by C_P and routed.
Routing - PLANNING7/11/2018 7/12/2018 FAIL
DetailsZachary Piepmeyer
Previous comments addressed.

New comments, as follows:

On the Additive Alternate work on the corner of Ash/River, the ped ramp should be positioned such that the existing utility pole does not obstruct the ADA landing at the top of the ramp. Also, there should be a bid item to relocate the fire hydrant either to a point behind the sidewalk or closer to the TBC so that it doesn’t block the pedestrian route. As shown in these plans, the hydrant is right in the middle of that route.


Routing - Erosion and Sediment7/11/2018 7/11/2018 PASS
DetailsMichael Zawacki
approved 6-11-18
Routing PW Street Lights7/10/2018 7/11/2018 FAIL
DetailsTom Marshall
Sheet C1.00 item 21 replace not retain. Sheet C2.00 item 14 replace. sent another email to KWoods.
Routing - PUBLIC WORKS7/10/2018 7/11/2018 FAIL
DetailsMorgan Webb
Plan resubmittals received  7/10/2018 DONE
Received two revised ESC Narratives and two full sets of plans. Inserted by LEG and routed.
Routing - PLANNING6/12/2018 6/15/2018 FAIL
DetailsZachary Piepmeyer
1. Per ACHD Policy Section 7200 for Collector roadways, attached sidewalk should be a minimum of 7.0’ wide. This would apply to the small section of attached sidewalk being reconstructed adjacent to 1190 W. River Street.

2. In order to improve maintainability, irrigation and to provide a better bike/ped route, please straighten out the sidewalk on NW corner of Ash/River, similar to the redline shown below. (See memo provided to Ron Hill on 6/15/18).

3. Can the proposed ped ramp throat on the NW corner of Ash/River be widened to 6.0’ to match the width of the River Street sidewalk?

4. The existing ped ramp and sidewalk on the NE corner of Ash/River is noncompliant. Is there any opportunity to improve that ped facility with this project?
1st review completed  6/15/2018 FAIL
failed current planning and street lights
Routing - FRONT DESK6/15/2018 6/15/2018 FAIL
DetailsTisha Gallop
penidng approvals from street lights and current planning
Routing - Design Review6/12/2018 6/12/2018 PASS
DetailsAndrea Tuning
DRH18-00060 Andrea Tuning
Routing - Erosion and Sediment6/8/2018 6/11/2018 PASS
DetailsAndy J. Long
ESC plan approved. RP listed is not currently certified. Need to designate certified RP at time of issuance. Site preparation inspection required.
Routing - FIRE  6/8/2018 PASS
DetailsErika Akin
No fire life safety inspection required
Routing PW Drainage6/8/2018 6/8/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights6/8/2018 6/8/2018 FAIL
DetailsTom Marshall
Routing - PUBLIC WORKS  6/8/2018 FAIL
DetailsRachael Beierle
FAILED DUE TO STREET LIGHTS. CONTACT TOM MARSHALL.
Routing - Addressing6/7/2018 6/7/2018 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  6/6/2018 DONE
Recd Pcfee & Taken To Pln CK  6/6/2018 DONE
Intake Approval  6/6/2018 PASS
Application received 6/6/2018