GRD-Final | 12/7/2018 | 12/7/2018 | 12/12/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Cloninger
|
Issue PAID IN FULL permit | | | 11/28/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/26/2018 | | DONE |
|
|
|
spoke with christopher informing him that this permit is going to expire in 8 days. stated he will send over the 302 and 306 forms
|
Routing - FRONT DESK | 7/19/2018 | | 7/23/2018 | | PASS |
Christina Prado
|
|
|
|
Plan assigned to Christina | 7/23/2018 | | 7/23/2018 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 7/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/23/2018 | | DONE |
|
|
|
Need:- All Met
RP
met christopher@thelandgroupinc.com
GC
Revised Value
plans are in the misc. draw
|
Telephone call | | | 7/23/2018 | | DONE |
|
|
|
called Denise to let know permit is ready and that we need the RP, GC and rev cert of val-left message on her phone
|
Plan assigned to (LEG) Tisha | 6/6/2018 | | 7/23/2018 | | DEFR |
Tisha Gallop
|
|
|
|
Routing PW Street Lights | 7/19/2018 | | 7/20/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 7/19/2018 | | 7/20/2018 | | PASS |
Zachary Piepmeyer
|
|
|
|
Routing - PUBLIC WORKS | 7/20/2018 | | 7/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 7/19/2018 | | DONE |
|
|
|
Received two full sets of plans. Inserted by C_P and routed.
|
Routing - PLANNING | 7/11/2018 | | 7/12/2018 | | FAIL |
Zachary Piepmeyer
|
|
|
Previous comments addressed.
New comments, as follows:
On the Additive Alternate work on the corner of Ash/River, the ped ramp should be positioned such that the existing utility pole does not obstruct the ADA landing at the top of the ramp. Also, there should be a bid item to relocate the fire hydrant either to a point behind the sidewalk or closer to the TBC so that it doesn’t block the pedestrian route. As shown in these plans, the hydrant is right in the middle of that route.
|
Routing - Erosion and Sediment | 7/11/2018 | | 7/11/2018 | | PASS |
Michael Zawacki
|
|
|
approved 6-11-18
|
Routing PW Street Lights | 7/10/2018 | | 7/11/2018 | | FAIL |
Tom Marshall
|
|
|
Sheet C1.00 item 21 replace not retain. Sheet C2.00 item 14 replace. sent another email to KWoods.
|
Routing - PUBLIC WORKS | 7/10/2018 | | 7/11/2018 | | FAIL |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 7/10/2018 | | DONE |
|
|
|
Received two revised ESC Narratives and two full sets of plans. Inserted by LEG and routed.
|
Routing - PLANNING | 6/12/2018 | | 6/15/2018 | | FAIL |
Zachary Piepmeyer
|
|
|
1. Per ACHD Policy Section 7200 for Collector roadways, attached sidewalk should be a minimum of 7.0’ wide. This would apply to the small section of attached sidewalk being reconstructed adjacent to 1190 W. River Street.
2. In order to improve maintainability, irrigation and to provide a better bike/ped route, please straighten out the sidewalk on NW corner of Ash/River, similar to the redline shown below. (See memo provided to Ron Hill on 6/15/18).
3. Can the proposed ped ramp throat on the NW corner of Ash/River be widened to 6.0’ to match the width of the River Street sidewalk?
4. The existing ped ramp and sidewalk on the NE corner of Ash/River is noncompliant. Is there any opportunity to improve that ped facility with this project?
|
1st review completed | | | 6/15/2018 | | FAIL |
|
|
|
failed current planning and street lights
|
Routing - FRONT DESK | 6/15/2018 | | 6/15/2018 | | FAIL |
Tisha Gallop
|
|
|
penidng approvals from street lights and current planning
|
Routing - Design Review | 6/12/2018 | | 6/12/2018 | | PASS |
Andrea Tuning
|
|
|
DRH18-00060 Andrea Tuning
|
Routing - Erosion and Sediment | 6/8/2018 | | 6/11/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. RP listed is not currently certified. Need to designate certified RP at time of issuance. Site preparation inspection required.
|
Routing - FIRE | | | 6/8/2018 | | PASS |
Erika Akin
|
|
|
No fire life safety inspection required
|
Routing PW Drainage | 6/8/2018 | | 6/8/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 6/8/2018 | | 6/8/2018 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | | | 6/8/2018 | | FAIL |
Rachael Beierle
|
|
|
FAILED DUE TO STREET LIGHTS. CONTACT TOM MARSHALL.
|
Routing - Addressing | 6/7/2018 | | 6/7/2018 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/6/2018 | | PASS |
|
|
|
|
Application received | | 6/6/2018 | | | |
|
|
|
|