GRD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | CANC |
Andy J. Long
|
|
|
Please call before arrival so that I can meet at Esther Simplot Park (rear parking lot). Construction is complete so I will need 10 min lead time, if possible. Thank you! Phone #: ###-#### >> Inspection requested via web by Tyler Ross Inspection cancelled from web by: Tyler Ross
|
GRD-Final | 7/25/2019 | 7/26/2019 | 8/20/2019 | A | CANC |
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tyler Ross Inspection cancelled from web by: Tyler Ross
|
(F) Reprint permit | | | 10/1/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/1/2018 | | DONE |
|
|
|
|
Plan assigned to Christina | | | 9/28/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | | | 9/28/2018 | | PASS |
Leon Letson
|
|
|
|
Routing PW Flood Plain | 9/26/2018 | | 9/28/2018 | | PASS |
Jason C. Taylor
|
|
|
|
Inspection Record Card-GRD | | | 9/28/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2018 | | DONE |
|
|
|
Called Olivia to advise permit is ready to issue, no fees due
|
Permit Ready to Issue | | | 9/28/2018 | | DONE |
|
|
|
All requirements met; no fees due
DO NOT RE-ISSUE
|
Plan Modification Accepted | | | 9/26/2018 | | DONE |
|
|
|
Plan Mod came in-in river work that was not permited when GRD 1st was issued-received 2 each cover sheet, GOO1-G006, D001, D101-D106, GC001-GC004, C001-C004, C101-C103, C131-C138, C141, C201- and 2 Ada Cnty recordings TOOK TO C_P
|
Issue PAID IN FULL permit | | | 9/12/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/5/2018 | | DONE |
Rita DeYoung
|
|
|
|
Telephone call | | | 8/31/2018 | | DONE |
|
|
|
Spoke with Olivia and she said she will refill the 306 with grading values only
|
Routing PW Flood Plain | 8/30/2018 | | 8/30/2018 | | PASS |
Jason C. Taylor
|
|
|
Plans redlined to remove all in river work. Once easements have been given then plans can be resubmited for approval. Jason Taylor ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2018 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 8/30/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2018 | | DONE |
|
|
|
MET
Need:
Revised Certificate of Value (sent email to Olivia, 8/31/18, double checking grading value is 7+ million)
MET
GC Form
RP
|
Telephone call | | | 8/30/2018 | | DONE |
|
|
|
Called Olivia to inform her the permit is ready, we need a 302 and 306 form filled out.
|
Plan assigned to Christina | 8/6/2018 | | 8/30/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - FRONT DESK | | | 8/30/2018 | | PASS |
Christina Prado
|
|
|
|
Routing - PLANNING | 8/30/2018 | | 8/30/2018 | | PASS |
Leon Letson
|
|
|
CFH17-00058, CFH17-00061 Need IDL, DEQ approval per Public Works Comments. Route back to Planning after Public Works signs off. LNL
|
Routing - PUBLIC WORKS | | | 8/30/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Flood Plain | 8/7/2018 | | 8/27/2018 | | FAIL |
Jason C. Taylor
|
|
|
Need DEQ & IDL approval before issuance. Route back to PW FLoodplain. JCT
|
Routing - FIRE | | 8/6/2018 | 8/23/2018 | | CANC |
Erika Akin
|
|
|
No review required for IFC. Please coordinate with Boise Fire to ensure emergency response is not adversely impacted.
|
Routing - Erosion and Sediment | | | 8/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan/SWPPP approved. Certified stormwater team designated. Pre-construction site preparation inspection is required. City inspection frequency at minimum of once every 2 weeks and during/after significant rain events.
|
Routing - Addressing | 8/6/2018 | | 8/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/6/2018 | | DONE |
|
|
|
|
Application received | | 8/3/2018 | | | |
|
|
|
|