GRD-Final | 7/19/2019 | 7/19/2019 | 7/19/2019 | A | DONE |
Tiffany Lowery
|
|
|
Public Works approval
|
Issue PAID IN FULL permit | | | 4/2/2019 | | DONE |
|
|
|
|
Meeting | | | 4/2/2019 | | DONE |
|
|
|
emailed permit over to Jeff hanes to sign and return. estimator@diamondidaho.com
|
CHANGE STATUS TO (REV) | | | 2/21/2019 | | DONE |
|
|
|
waiting for P&Z to do plan review
|
Routing - PLANNING | 2/21/2019 | | 2/21/2019 | | PASS |
Josh Wilson
|
|
|
|
CHANGE STATUS TO (RDY) | | | 2/21/2019 | | DONE |
|
|
|
P&Z signed off so permit is ready
|
Plan assigned to (CAN) Candy | 1/23/2019 | | 2/20/2019 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - FRONT DESK | 1/23/2019 | | 2/20/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 1/23/2019 | | 2/20/2019 | | PASS |
Josh Wilson
|
|
|
No Review req'd per CC
|
Routing PW Street Lights | 2/20/2019 | | 2/20/2019 | | PASS |
Tom Marshall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2019 | | DONE |
|
|
|
MET
Need
RP
Revised Value
GC Form
met (CAN)-DO NOT ISSUE until Josh in P&Z gives the ok (they need to look at it)
|
Routing PW Geothermal | 1/28/2019 | | 2/12/2019 | | PASS |
Javier Guzman
|
|
|
New geothermal lines, manhole locations have changed. Contact Public Works for as-builts and/or locates.
|
Routing - Erosion and Sediment | 1/23/2019 | | 1/31/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Need to designate ESC Responsible Person. SITE PREPARATION inspection required.
|
Routing - FIRE | 1/23/2019 | 1/23/2019 | 1/29/2019 | | PASS |
Erika Akin
|
|
|
No comments attached
|
Routing - ELECTRICAL | 1/23/2019 | | 1/28/2019 | | CANC |
Candy A. Nichols
|
|
|
no ele review required
|
Routing PW Drainage | 1/23/2019 | | 1/28/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/23/2019 | | 1/25/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Design Review | 1/25/2019 | | 1/25/2019 | | PASS |
Josh Wilson
|
|
|
No DR required.
|
Routing - Addressing | 1/23/2019 | | 1/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/23/2019 | | 1/23/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 1/23/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2019 | | DONE |
|
|
|
no fees paid (St Lukes)
|
Application received | | | 1/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 17 2019 9:21AM
|
Intake Approval | | | 1/17/2019 | | FAIL |
|
|
|
Rejected at request of Kirsten Dietrick, The Land Group. She needs to upload one more document: Operations and Maintenance Manual.
|
GRD-Final | 7/26/2019 | 7/26/2019 | | P | |
|
|
|