Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberGRD19-00029
StatusFinaled
Name GUHO CORP
Site Address 152 N CAPITOL BLVD
Project NameCCDC STREETS
Customer NumberDRH19-00052, DRH19-00090
ePlanReviewYes
Description
(STREETSCAPES 6TH ST & BLK 7) - SPECIAL INSPECTION REQUIRED FOR POLE FOUNDATIONS SEE SHEET S1.0. Grading permit to excavate for improvements for new streetscapes on Block 7 Alley and 6th street . All work to be performed as approved by the Public Works Department and Planning & Zoning Department under DRH19-00052 and DRH19-00090. Separate electrical and plumbing permit may be required for site underground utilities. No buildings or footings are allowed to be constructed under this permit. (TCH)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GRD-Final7/29/20207/29/20208/4/2020APASS
DetailsDave Hannah
I have the final conformance letter from Strata Phone #: ###-#### Inspection requested via web by Rob Cloninger
GRD-Final7/1/20207/1/20207/1/2020ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Rob Cloninger ele insp/ si reports required
Plan assigned to (TCH) TIffany3/26/2020 4/7/2020 DONE
DetailsTiffany Carson-Herker
PLANS/APPL TAKEN TO FRONT DESK  4/7/2020 DONE
Permit Ready to Issue  4/7/2020 DONE
DO NOT ISSUE- plan mod
CHANGE STATUS TO (ISS)  4/7/2020 DONE
Routing PW Environmental3/26/2020 4/7/2020 PASS
DetailsTiffany Carson-Herker
PLAN MOD
Routing PW Solid Waste3/26/2020 3/31/2020 PASS
DetailsEvan Carpenter
PLAN MOD
Routing PW Drainage3/26/2020 3/30/2020 PASS
DetailsJason C. Taylor
Routing PW Sewer Design3/26/2020 3/27/2020 PASS
DetailsDeAnn Brown
New sewer service to the Reef shall be privately owned and maintained. License agreement with ACHD is being altered to include this service.
Routing - PLUMBING3/26/2020 3/27/2020 PASS
DetailsDan Ediger
Per plans and ISPC
Routing - PUBLIC WORKS3/26/2020 3/26/2020 PASS
DetailsCandy A. Nichols
PLAN MOD
Plan Modification Accepted  3/26/2020 DONE
Relocation of grease interceptor and sewer line. This will just need to be routed to Sewer & Plumbing
Routing PW Street Lights11/19/2019 11/22/2019 PASS
DetailsTom Marshall
Routing - FRONT DESK11/22/2019 11/22/2019 PASS
DetailsTiffany Carson-Herker
Plan Mod Approved
PLANS/APPL TAKEN TO FRONT DESK  11/22/2019 DONE
Permit Ready to Issue  11/22/2019 DONE
**DO NOT REISSUE - PLAN MOD**
CHANGE STATUS TO (ISS)  11/22/2019 DONE
Plan assigned to (TCH) TIffany11/18/2019 11/22/2019 DONE
DetailsTiffany Carson-Herker
Routing - PLANNING11/18/2019 11/20/2019 PASS
DetailsJosh Wilson
plan mod
Routing - FIRE11/18/201911/18/201911/19/2019 PASS
DetailsErika Akin
Plan mod review 1 hour
Routing - PUBLIC WORKS11/18/2019 11/19/2019 PASS
DetailsMorgan Webb
plan mod
Plan Modification Accepted  11/18/2019 DONE
We had to revise the layout of the string lights because there were too many utilities extending off the back of the Telephone building that conflicted with the tensioned support cable that ran the length of the north building façade and the existing fire escape access/ladders at that building. With the new approach, there is a minimal increase in the amount of string lights being installed in the alley. This required modifications to the site, layout and electrical plans for the alley
Issue PAID IN FULL permit  10/1/2019 DONE
Inspection Record Card-GRD  10/1/2019 DONE
Telephone call  9/27/2019 DONE
called Anthony to veriy that the total valuation was correct? He said yet it was so figured the fees and sent him the tootal due.
Telephone call  9/27/2019 DONE
talked to Ron Hill-if there are any quesitons about the fees contact him
Telephone call  9/26/2019 DONE
emailed Anthony-still need RP as well as I'm questioning the valuation he put down. It's almost 2 million. I called him but the phone just ran and ran
Routing PW Street Lights6/17/2019 6/19/2019 PASS
DetailsTom Marshall
Routing - FRONT DESK6/19/2019 6/19/2019 PASS
DetailsTiffany Carson-Herker
1st review completed  6/19/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/19/2019 DONE
Permit Ready to Issue  6/19/2019 DONE
all met-emailed anthony@guhocorp.com the fees due 9/27/19 also emailed Brady Hitchins the fees due per his request CAN
Need GC-met
Need Rev Val-met
Need RP-met
Plan assigned to (TCH) TIffany4/30/2019 6/19/2019 DONE
DetailsTiffany Carson-Herker
Routing - Design Review6/17/2019 6/18/2019 PASS
DetailsJosh Wilson
Routing PW Drainage6/17/2019 6/18/2019 PASS
DetailsBrian Murphy
Routing - FRONT DESK6/6/2019 6/6/2019 FAIL
DetailsTiffany Carson-Herker
fail due to PW Drainage and PW Street Lights
Routing - PLAN CHECK5/30/2019 6/6/2019 PASS
DetailsCarl D Madsen
Ron Hill wanted me to add you
Routing PW Drainage5/30/2019 6/6/2019 FAIL
DetailsBrian Murphy
per eplan
Routing PW Street Lights5/30/2019 5/31/2019 FAIL
DetailsTom Marshall
Routing - PLANNING5/30/2019 5/31/2019 PASS
DetailsJosh Wilson
Revised drawings address concerns.
Routing - FRONT DESK4/30/2019 5/8/2019 FAIL
DetailsTiffany Carson-Herker
faill per Planning, Drainage and Street lights
Routing - PLANNING4/30/2019 5/8/2019 FAIL
DetailsZachary Piepmeyer
See changemarks sheets C2.14, C4.01, C4.11, C4.13 per Zach Piepmeyer
Routing - FIRE4/30/20194/30/20195/7/2019 PASS
DetailsErika Akin
Per Ron Johnson, streetscape improvements approved.
Routing PW Street Lights4/30/2019 5/2/2019 FAIL
DetailsTom Marshall
Plans need major changes.
Routing PW Sewer Design4/30/2019 5/2/2019 PASS
DetailsDeAnn Brown
Routing - Erosion and Sediment4/30/2019 5/2/2019 PASS
DetailsMichael Zawacki
Valid RP needed before permit issues. Urban project.
Routing PW Solid Waste4/30/2019 5/1/2019 PASS
DetailsEvan Carpenter
Routing PW Drainage4/30/2019 4/30/2019 FAIL
DetailsBrian Murphy
need achd stamp signed
Routing - Addressing4/30/2019 4/30/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/30/2019 4/30/2019 PASS
DetailsMorgan Webb
Routing - PLUMBING4/30/2019 4/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Plans ACCEPTED BY PLAN TECH  4/30/2019 DONE
Recd Pcfee & Taken To Pln CK  4/30/2019 DONE
Intake Approval  4/30/2019 PASS
Application received  4/22/2019 DONE
Application submitted via PDS Online on Apr 22 2019 4:44PM