GRD-Public Works Approval | 6/22/2020 | 6/22/2020 | 6/22/2020 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please Call Wes Palm Phone #: ###-#### Inspection requested via web by Wes palm
|
Issue PAID IN FULL permit | | | 10/11/2019 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 10/11/2019 | | DONE |
|
|
|
|
Plan assigned to (JCA) Judith | 7/2/2019 | 7/2/2019 | 10/8/2019 | | DONE |
Judith Amador
|
|
|
|
Routing - FRONT DESK | 10/8/2019 | | 10/8/2019 | | PASS |
Judith Amador
|
|
|
passed all departments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
ALL MET (wharrison@prusikbuilt.com)
NEED Revised Cert of Value, GC, RP
|
Routing - FIRE | 9/30/2019 | 9/30/2019 | 10/4/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Design Review | 9/30/2019 | | 9/30/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Drainage | 9/4/2019 | | 9/11/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 9/4/2019 | 9/4/2019 | 9/10/2019 | | FAIL |
Mark Scharfen
|
|
|
09/10-Andrade's Grading resubmittal. Fire review complete. Uploaded and emailed architect rev_fire 09.10.2019.pdf
|
Routing PW Solid Waste | 9/4/2019 | | 9/5/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 9/4/2019 | | 9/4/2019 | | FAIL |
Katelyn Menuge
|
|
|
Trash enclosure must meet 10-foot rear setback. Need to finalize ROS19-00070.
|
Routing PW Sewer Design | 7/2/2019 | | 7/17/2019 | | PASS |
Mike Sheppard
|
|
|
|
Routing - FRONT DESK | 7/2/2019 | | 7/17/2019 | | FAIL |
Judith Amador
|
|
|
Fail do to- Fire, PW drainage, PW solid waste and Design review
|
Routing PW Environmental | 7/2/2019 | | 7/16/2019 | | PASS |
Rick Christenson
|
|
|
Grading approved.
|
Routing - FIRE | 7/2/2019 | 7/2/2019 | 7/15/2019 | | FAIL |
Mark Scharfen
|
|
|
07.15.2019-Completed fire review. Uploaded rev_fire 07.15.2019.pdf and emailed architect.
|
Routing PW Drainage | 7/2/2019 | | 7/10/2019 | | FAIL |
Brian Murphy
|
|
|
NEED GRADING2 FEET OFF P. LINEGROUND WATER EST APX J
|
Routing PW Street Lights | 7/2/2019 | | 7/8/2019 | | PASS |
Tom Marshall
|
|
|
Street light plans must be on the BLD plans.
|
Routing - PLUMBING | 7/2/2019 | | 7/5/2019 | | PASS |
Dan Ediger
|
|
|
|
Routing - PLANNING | 7/2/2019 | | 7/3/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please upload copy of recorded shared access and parking agreement.
|
Routing PW Solid Waste | 7/2/2019 | | 7/3/2019 | | FAIL |
Evan Carpenter
|
|
|
All sheets showing the solid waste enclosure must match. Sheet C.6 shows different dimensions on the solid waste enclosure than sheet C.3. The enclosure as proposed in sheet C.3 must have at least 12 feet of unobstructed clearance between gate posts (18 feet for two dumpsters), and a depth of 12 feet.
|
Routing - Addressing | 7/2/2019 | | 7/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2019 | | 7/2/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 7/2/2019 | | 7/2/2019 | | PASS |
Michael Zawacki
|
|
|
RP Needed.
Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2019 | | DONE |
|
|
|
|
Application received | | | 6/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2019 4:37PM
|
Routing PW Drainage | 9/30/2019 | | | | |
Brian Murphy
|
|
|
|