Final | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | FAIL |
Dixie Fellows
|
|
|
Dwyane ###-#### alan did this 9/8/2000 12:35:16 PM done by 415 9/8/2000 1:00:10 PM
|
Final | 9/6/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 12:44:27. Contact: ###-####.
|
Rough-in | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 10:19:06. Contact: ###-####.
|
Rough-in | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 08:18:12. Contact: ###-####. C/N posted 6/13/00 2:39:10 PM
|
Rough-in | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | FAIL |
Dave Lightfoot
|
|
|
paul ###-#### C/N posted 6/13/00 11:48:36 AM
|
Pressure Test | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PASS |
Dave Lightfoot
|
|
|
paul ###-####
|
Issue & PRINT FEE-DUE permit | | | 6/9/2000 | | DONE |
|
|
|
|
Application received | | | 6/9/2000 | | |
|
|
|
|