(F) Reprint permit | | | 11/27/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/27/2000 | | DONE |
|
|
|
|
Final | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PASS |
Dave Lightfoot
|
|
|
fn rick -###-#### re-insp
|
Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Rick ###-#### can,t find lower combustion air 10/30/2000 2:54:17 PM
|
Final | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | CANC |
Jim Storey
|
|
|
FN INSP RICK ###-#### --CANCEL PER SUE ELLEN WILL CALL BACK
|
Rough-in | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 15:55:22. Contact: ###-####. ri and gas test ok 8/17/2000 11:22:42 AM
|
Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### cn posted 8/15/2000 2:45:41 PM
|
Pressure Test | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Dave Lightfoot
|
|
|
|
Application received | | | 8/15/2000 | | |
|
|
|
|
Issue & PRINT permit | | | 8/15/2000 | | DONE |
|
|
|
|