Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Dave Lightfoot
|
|
|
Theresa ###-####
|
Pressure Test | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 08:20:06. Contact: ###-####.
|
Pressure Test | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 08:13:12. Contact: ###-####. high side 60 psi gas test ok 1/3/2001 2:30:46 PM
|
Pressure Test | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 08:24:59. Contact: ###-####.
|
Application received | | | 12/27/2000 | | |
|
|
|
|
Issue & PRINT permit | | | 12/27/2000 | | DONE |
|
|
|
|