Final | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 07:34:13. Contact: ###-####.
|
Final | 4/20/2001 | 4/20/2001 | 4/20/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### need full 1/2" I.D. gas flex connector at furn 4/20/2001 1:27:22 PM
|
Rough-in | 1/31/2001 | 2/1/2001 | 2/1/2001 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 14:48:02. Contact: ###-####. done by 411 2/1/2001 1:42:07 PM
|
Rough-in | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 2/1/2001 1:08:18 PM r/i and gas ok
|
Application received | | | 1/31/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 1/31/2001 | | DONE |
|
|
|
|