Telephone call | | | 6/1/2001 | | DONE |
Kim Harrison
|
|
|
|
Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 15:48:07. Contact: ###-####.
|
Final | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | NR |
Alan Hauser
|
|
|
protect bolt heads at the backwall of grease hood 4/4/2001 11:59:27 AM
|
Final | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | NR |
Alan Hauser
|
|
|
left corrections on both class 1 hoods, gave one to nu mechanical and posted one copy in front window 3/26/2001 1:31:47 PM
|
Final | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | NR |
Alan Hauser
|
|
|
left corrections on both class 1 hoods, gave one to nu mechanical and posted one copy in front window 3/26/2001 1:31:47 PM
|
Application received | | | 3/23/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 3/23/2001 | | DONE |
|
|
|
|