Final | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 11:36:50. Contact: ###-####.
|
DOC - Permit Finaled | 11/20/2001 | 11/20/2001 | 11/20/2001 | A | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 11/20/2001 10:18:10 AM
|
Final | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Alan Hauser
|
|
|
locked 9/28/2001 2:18:15 PM
|
Final | 9/4/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Dixie Fellows
|
|
|
SAM-###-####... 9/4/2001 2:31:29 PM need permanant access ladder to equipment in attic 9/5/2001 4:30:06 PM
|
Final | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | FAIL |
Dixie Fellows
|
|
|
###-#### vent reg outside...complete comb air term to outside 8/30/2001 12:54:04 PM
|
Final | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 09:52:34. Contact: ###-####...###-#### 8/29/2001 12:51:52 PM
|
Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | CANC |
Alan Hauser
|
|
|
need final by orginal inspector of r/i, #411, hvac not as per orginal plans in trailer 8/28/2001 12:26:59 PM
|
Pressure Test | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Alan Hauser
|
|
|
underground to pool boiler only looked at, pt ok 60# 7/31/2001 12:21:26 PM
|
Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Dixie Fellows
|
|
|
call Jeff ###-####
|
Pressure Test | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Dixie Fellows
|
|
|
|
Application received | | | 6/6/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 6/6/2001 | | DONE |
|
|
|
|