Final | 11/21/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 11/21/2001 1:31:05 PM
|
DOC - Permit Finaled | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 11/26/2001 9:41:35 AM
|
Override - Parcel Holds | | | 11/21/2001 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: Stop work on 1 and 2 hour walls on the 3rd floor and all other work okay per George Slane. They can have inpections but not on 1 and 2 hour walls on 3rd floor. Per Tom A. aml Reason for OverRide: FINAL ON GAS LINE
|
Rough-in | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PASS |
Alan Hauser
|
|
|
###-#### hydronic piping tested and inspected by engineer of record 10/31/2001 1:49:51 PM
|
Pressure Test | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PASS |
Alan Hauser
|
|
|
presure test on hydronic piping witnessed by engineer of record 10/31/2001 1:50:15 PM
|
MEC-Aging Inspection | 9/17/2001 | 9/17/2001 | 9/17/2001 | | CANC |
Alan Hauser
|
|
|
|
DOC - Permit Expired | 9/17/2001 | 9/17/2001 | 9/17/2001 | A | PASS |
Alan Hauser
|
|
|
Expired by inspector at 9/17/2001 8:49:06 AM
|
Pressure Test | 7/13/2001 | 7/16/2001 | 7/16/2001 | P | PASS |
Alan Hauser
|
|
|
whole system 60# test, even low side 7/16/2001 3:10:07 PM
|
Pressure Test | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | NR |
Dave Lightfoot
|
|
|
###-#### test all piping 7/11/2001 2:55:45 PM
|
Issue & PRINT permit | | | 7/11/2001 | | DONE |
|
|
|
|
Application received | | | 7/11/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 7/11/2001 | | DONE |
|
|
|
|