Final | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | DONE |
Alan Hauser
|
|
|
this was final on 9/26 10/18/2001 12:18:32 PM
|
DOC - Permit Finaled | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 10/18/2001 12:18:34 PM
|
Final | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### ED c/n ok 9/26/2001 12:01:10 PM
|
Final | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | FAIL |
Dave Lightfoot
|
|
|
fn eddie ###-#### re-insp c/n posted 9/25/2001 10:15:32 AM
|
Final | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### corrections not done...42.00 fee 9/21/2001 3:05:21 PM
|
Final | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 11:43:38. Contact: ###-####. need comb air..insulate metaL..1/4" RISE PER FOOT ON FLUE 9/20/2001 12:39:50 PM
|
Pressure Test | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Dixie Fellows
|
|
|
###-#### gas ok...equip not set 9/7/2001 10:36:51 AM
|
Issue permit | | | 9/6/2001 | | DONE |
|
|
|
|
Application received | | | 9/6/2001 | | |
|
|
|
|