Pressure Test | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PASS |
Dixie Fellows
|
|
|
###-#### ANDRIA ENTER BACK YARD THROUGH EAST SIDE GATE.
|
DOC - Permit Finaled | 9/19/2001 | 9/19/2001 | 9/19/2001 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 9/19/2001 12:33:46 PM
|
Pressure Test | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 13:39:40. Contact: ###-####.
|
Pressure Test | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### need factory covered pipe below grade 9/10/2001 1:56:40 PM
|
Final | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Dave Lightfoot
|
|
|
|
Issue & PRINT permit | | | 9/10/2001 | | DONE |
|
|
|
|
Application received | | | 9/10/2001 | | |
|
|
|
|