Final | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Alan Hauser
|
|
|
john ###-#### fn
|
DOC - Permit Finaled | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 3/8/2002 3:01:55 PM
|
Owner Supplied Equipment | 9/19/2001 | | 1/30/2002 | | DONE |
|
|
|
|
MEC-Aging Inspection | 12/19/2001 | 12/19/2001 | 12/19/2001 | | CANC |
Alan Hauser
|
|
|
|
(F) Reprint permit | | | 11/19/2001 | | DONE |
|
|
|
|
Pressure Test | 10/19/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 06:34:49. Contact: ###-####. all areas for temp occ ok 10/19/2001 10:55:56 AM
|
Pressure Test | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 16:35:25. Contact: ###-####.
|
Final | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 11:14:14. Contact: ###-####. #24 corridors ok 10/16/2001 1:11:07 PM #24 corridors ok 10/16/2001 1:11:37 PM
|
Pressure Test | 9/26/2001 | 9/26/2001 | 9/26/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 06:36:18. Contact: ###-####. 3'above corridor tunnel 60 psi test ok 9/26/2001 10:03:42 AM
|
Conference | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 14:39:20. Contact: ###-####. about gas pipe 9/19/2001 10:30:18 AM
|
(F) Reprint permit | | | 9/19/2001 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/18/2001 | | DONE |
|
|
|
I moved fees from mec01-01167 one permit was pulled and should have had 3 I paid 161.11 of this permit and all mec01-02796
|
Application received | | | 9/18/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 9/18/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/18/2001 | | DONE |
|
|
|
|