Final | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 07:56:27. Contact: .
|
DOC - Permit Finaled | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 1/11/2002 2:53:49 PM
|
Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 09:15:05. Contact: .
|
Pressure Test | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 09:16:07. Contact: .
|
Rough-in | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PART |
Dixie Fellows
|
|
|
zach ###-#### AND PRESSURE TEST..between orchard and roosevelt.. 11/26/2001 12:45:10 PM left corrections..called zach...gas ok on both units 11/26/2001 3:48:54 PM
|
Rough-in | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | FAIL |
Tom Arcoraci
|
|
|
ZACH ###-#### cn posted 11/21/2001 3:40:18 PM
|
Issue & PRINT permit | | | 11/21/2001 | | DONE |
|
|
|
|
Application received | | | 11/21/2001 | | |
|
|
|
|