Telephone call | | | 5/8/2002 | | DONE |
|
|
|
|
Pressure Test | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Dixie Fellows
|
|
|
|
Final | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Dixie Fellows
|
|
|
|
DOC - Permit Finaled | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 12/13/2001 3:32:52 PM
|
DOC - Permit Finaled | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 12/13/2001 3:33:03 PM
|
Final | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 15:06:04. Contact: ###-####. gas test failed..regulator to be vented outside 12/12/2001 3:55:38 PM
|
Pressure Test | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Dixie Fellows
|
|
|
|
Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Dixie Fellows
|
|
|
GARY ###-####
|
Final | 12/10/2001 | 12/11/2001 | 12/11/2001 | P | NR |
Dixie Fellows
|
|
|
GARY ###-####\\
|
Pressure Test | 12/10/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Dixie Fellows
|
|
|
51-3374 guage pegged at 100 12/11/2001 1:47:04 PM
|
Rough-in | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 10:03:01. Contact: ###-####...by executive 11/29/2001 12:14:30 PM...###-#### 11/29/2001 12:34:52 PM ok to cover wall where line set and condensate are located 11/29/2001 1:03:14 PM
|
Application received | | | 11/29/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 11/29/2001 | | DONE |
|
|
|
|