Final | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 08:35:21. Contact: .
|
DOC - Permit Finaled | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 2/25/2002 5:50:39 PM
|
Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 08:29:44. Contact: .
|
Rough-in | 12/11/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 15:46:37. Contact: . needs to use manufatures protection devices 12/12/2001 2:53:32 PM
|
Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | FAIL |
Alan Hauser
|
|
|
c/n posted 12/11/2001 1:50:44 PM
|
Pressure Test | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | PASS |
Dave Lightfoot
|
|
|
###-#### ZACK
|
Issue & PRINT permit | | | 12/3/2001 | | DONE |
|
|
|
|
Application received | | | 12/3/2001 | | |
|
|
|
|