Final | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Dixie Fellows
|
|
|
GREG ###-#### AND PRESSURE WITNESS
|
DOC - Permit Finaled | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 1/28/2002 4:38:33 PM
|
Final | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### posted corrections on door of ti...called greg 1/25/2002 10:41:21 AM
|
Pressure Test | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PASS |
Dixie Fellows
|
|
|
pres test -greg ###-#### all 3 gas lines ok..20# 1/8/2002 3:27:44 PM
|
Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 18:54:29. Contact: ###-####. check items at final..insulate vent pipe in attic with 1/2" armaflex..light at entrance..drain pan pipe to terminate at floor drain.. 1/3/2002 10:01:01 AM
|
Rough-in | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Dixie Fellows
|
|
|
###-#### GREG posted corrections...called greg 1/2/2002 2:19:16 PM
|
Rough-in | 12/28/2001 | 12/28/2001 | 12/28/2001 | P | NR |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 12/28/2001 | 12/28/2001 | 12/28/2001 | P | NR |
Dixie Fellows
|
|
|
###-####
|
Application received | | | 12/27/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 12/27/2001 | | DONE |
|
|
|
|