Final | 2/19/2003 | 2/19/2003 | 2/19/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/19/2003 at 12:31:44 AM. Contact: ###-####...past collister 2/19/2003 9:25:08 AM
|
DOC - Permit Finaled | 2/19/2003 | 2/19/2003 | 2/19/2003 | A | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 2/19/2003 10:30:03 AM
|
Final | 1/15/2003 | 1/16/2003 | 1/16/2003 | A | FAIL |
Alan Hauser
|
|
|
left c/n with home owner 1/16/2003 9:34:33 AM
|
Rough-in | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 10:58:11. Contact: ###-####.
|
Conference | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Alan Hauser
|
|
|
only looked at master bedroom and bath, corrections in other areas, not to cover 8/9/2002 2:12:04 PM
|
Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 05:24:20. Contact: ###-####.down stairs area only ok to cover 5/21/2002 10:09:37 AM
|
Rough-in | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 22:38:04. Contact: ###-####. furn at kit ok,range vent ok, dryer vent needs eng system 6 inch ok for less han 49 ft 5/17/2002 8:49:41 AM
|
Pressure Test | 3/18/2002 | 3/18/2002 | 3/18/2002 | A | FAIL |
Alan Hauser
|
|
|
pressure test failed, corrections made at piping 3/18/2002 9:39:14 AM
|
Pressure Test | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 3/18/2002 9:38:41 AM
|
Pressure Test | 3/1/2002 | 3/5/2002 | 3/5/2002 | P | FAIL |
Alan Hauser
|
|
|
need shut off at fire place, and remove three unions in line. pipe undersized, so will have to go to 2# system. check vents and regulators at final 3/5/2002 2:19:08 PM
|
Application received | | | 2/13/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 2/13/2002 | | DONE |
|
|
|
|