PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | PART |
Dixie Fellows
|
|
|
BRIAN ###-#### talked about hood..needs to be 30" 10/30/2002 12:39:15 PM
|
Pressure Test | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | CANC |
Dixie Fellows
|
|
|
BRIAN ###-#### already done 10/30/2002 12:39:28 PM
|
PostCard Mailed | | | 10/17/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 15:52:23. Contact: ...ustick..left on kelly 4/15/2002 8:32:19 AM insulate metal in garage..complete condensate..need to see range exhaust when ready 4/15/2002 9:31:43 AM
|
Issue & PRINT permit | | | 3/19/2002 | | DONE |
|
|
|
|
Application received | | | 3/19/2002 | | |
|
|
|
|