Third Notice MEC | 6/12/2003 | 6/12/2003 | 11/10/2003 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notification | 5/8/2003 | 5/8/2003 | 6/12/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/20/2002 | 5/8/2003 | | DONE |
|
|
|
|
Final | 4/30/2002 | 4/30/2002 | 4/30/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by Inspector: 407 On 4/30/2002 12:17:41 PM
|
DOC - Permit Finaled | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 4/30/2002 1:09:32 PM
|
Pressure Test | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Dixie Fellows
|
|
|
|
Pressure Test | 4/23/2002 | 4/24/2002 | 4/23/2002 | A | CANC |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 4/23/2002 7:48:16 PM ###-####..key to roof on elec box
|
Pressure Test | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### door to roof locked 4/23/2002 11:41:14 AM
|
Pressure Test | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | CANC |
Dixie Fellows
|
|
|
|
Final | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Dixie Fellows
|
|
|
###-#### need gas test 4/22/2002 4:19:53 PM
|
Application received | | | 4/18/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 4/18/2002 | | DONE |
|
|
|
|