Third Notice MEC | 6/12/2003 | 6/12/2003 | 6/20/2003 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notification | 5/8/2003 | 5/8/2003 | 6/12/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/25/2002 | 5/8/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/25/2002 11:41:45 AM
|
Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Jim Sly
|
|
|
Rough in approved....Stamped letter from Bob Ticker (Eng.) for approval of insulation in plenum. (faxed to Dixie). 9/25/2002 11:35:08 AM
|
Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
need correct info from engineer on insulation in r/a plenum 9/5/2002 8:58:31 AM
|
Final | 9/5/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
|
Rough-in | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 11:34:33. Contact: ###-####....###-#### 9/4/2002 12:06:22 PM
|
Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 11:35:10. Contact: ###-####.
|
Rough-in | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | CANC |
Dixie Fellows
|
|
|
###-#### ben will meet ben thurs am 8:30 9/4/2002 1:50:39 PM
|
Final | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | CANC |
Dixie Fellows
|
|
|
ben
|
Rough-in | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | FAIL |
Alan Hauser
|
|
|
duct, s/f dampers ok, but correction on return air system. code doesn't allow ceiling to be insulated with fiber glass batt insulation. left c/n 8/9/2002 3:06:48 PM
|
Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | NR |
Dixie Fellows
|
|
|
###-#### TML
|
Issue & PRINT permit | | | 8/6/2002 | | DONE |
|
|
|
|
Application received | | | 8/6/2002 | | |
|
|
|
|