Final | 11/6/2002 | 11/6/2002 | 11/6/2002 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/6/2002 | 11/6/2002 | 11/6/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 11/6/2002 3:36:59 PM
|
Final | 10/23/2002 | 10/23/2002 | 10/23/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 08:54:08. Contact: ###-####.c/n on site 10/23/2002 4:22:57 PM
|
Pressure Test | 8/19/2002 | 8/19/2002 | 8/19/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/19/2002 at 08:53:38. Contact: ###-####...already done 8/19/2002 6:30:19 PM
|
Rough-in | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/13/2002 at 13:33:04. Contact: ###-####. P/T OK 8/14/2002 2:18:28 PM
|
Rough-in | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 15:49:00. Contact: ###-####. called rhonda 8/12/2002 11:08:05 AM
|
Pressure Test | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 15:49:20. Contact: ###-####. posted corrections...called rhonda 8/12/2002 11:25:03 AM
|
Application received | | | 8/9/2002 | | |
|
|
|
|
Issue permit | | | 8/9/2002 | | DONE |
|
|
|
|