Final | 1/30/2004 | 1/30/2004 | 1/30/2004 | A | DONE |
Dixie Fellows
|
|
|
OK TO FINAL THIS PERMIT PER DIXIE , THIS PERMIT WAS DOC FINALED ON 3-20-03 ///DLD
|
Third Notice MEC | 6/12/2003 | 6/12/2003 | 11/17/2003 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notification | 5/8/2003 | 5/8/2003 | 6/12/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/20/2003 | 5/8/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 3/20/2003 11:54:01 AM
|
MEC-Aging Inspection | 3/20/2003 | 3/20/2003 | 3/20/2003 | | PASS |
Dixie Fellows
|
|
|
|
Pressure Test | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### dennis
|
Pressure Test | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### dennis NEED BTU LOAD AND LENGTH OF PIPE..TALKED TO CONT 9/10/2002 12:20:29 PM
|
Override - Parcel Holds | | | 9/10/2002 | | |
|
|
|
|
Pressure Test | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Dixie Fellows
|
|
|
DENNIS ###-####...between roosevelt and orchard 9/9/2002 7:52:06 AM CONTRACTOR NOT LICENSED IN CITY 9/9/2002 11:13:46 AM
|
Override - Parcel Holds | | | 9/9/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 9/9/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 9/6/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2002 | | DONE |
|
|
|
|
Application received | | | 9/6/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 9/6/2002 | | |
|
|
|
|