PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Final | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | PASS |
Russ Owen
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Waited approxan hour for contractor to finish corrections so that I could final the house building permit. Would not typical do this a I do not have the time but owner would like to move in. 2/5/2003 4:25:52 PM 2/5/2003 4:49:13 PM
|
Final | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | FAIL |
Russ Owen
|
|
|
late pm ###-#### c/n posted for condensate line needs to go to the exterior, insulate plenum in garage insulate exposed metal in crawl at/near under furnace. 2/4/2003 4:38:27 PM
|
Rough-in | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|
Rough-in | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### 10/14/2002 1:14:39 PM strap vert flue every 8' 10/15/2002 10:05:59 AM
|
Pressure Test | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | PASS |
Dixie Fellows
|
|
|
###-#### 10/14/2002 1:14:48 PM
|
Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | NR |
Russ Owen
|
|
|
###-####
|
Pressure Test | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | NR |
Russ Owen
|
|
|
|
Issue & PRINT permit | | | 10/14/2002 | | DONE |
|
|
|
|
Application received | | | 10/14/2002 | | |
|
|
|
|