Final | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Russ Owen
|
|
|
###-#### joe
|
DOC - Permit Finaled | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 3/5/2003 12:29:36 PM
|
Final | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | FAIL |
Russ Owen
|
|
|
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. insulation has not been put on pipe,as told to contractor. builder on site notified and left message with Randy. 2/28/2003 2:57:17 PM
|
Final | 2/26/2003 | 2/27/2003 | 2/27/2003 | P | FAIL |
Russ Owen
|
|
|
###-####. Called contractror needs verification from furnace company for extended height of abs vent pipe above roof, 1/2 insulation required for pipe in unconditioned space,also a screen at vent termination required. no c/n posted door was locked at my return from truck talked withRandy. 2/27/2003 3:17:07 PM
|
Rough-in | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
Pressure Test | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
Rough-in | 11/13/2002 | 11/15/2002 | 11/15/2002 | A | FAIL |
Steven Webb
|
|
|
randy ###-#### C/N posted 11/15/2002 8:48:59 AM
|
Issue & PRINT permit | | | 11/13/2002 | | |
|
|
|
|
Application received | | | 11/13/2002 | | |
|
|
|
|