PostCard Mailed | | | 12/10/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 10/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Pressure Test | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/12/2003 at 16:17:41. Contact: ###-####.
|
Pressure Test | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | CANC |
Alan Hauser
|
|
|
please inspect range vent and gas line as close to 3:00pm as possible. If this does not work please give me a call.
Thanks
Carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen Inspection cancelled from web by: Carol Rasmusssen
|
Final | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | CANC |
Alan Hauser
|
|
|
please inspect range vent and gas line as close to 3:00pm as possible. If this does not work please give me a call.
Thanks
Carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen Inspection cancelled from web by: Carol Rasmusssen
|
Application received | | | 2/5/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 2/5/2003 | | |
|
|
|
|