Final | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 8:37:10 AM. Contact: ###-####.
|
DOC - Permit Finaled | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 7/30/2003 2:12:37 PM
|
Final | 6/12/2003 | 6/13/2003 | 6/12/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 8:31:04 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 12 2003 3:02PM.
|
Rough-in | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 12:25:41 PM. Contact: ###-####...orchard..left on irving..right on pond 3/6/2003 9:26:39 AM
|
Rough-in | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/28/2003 at 8:51:42 AM. Contact: ###-####. cn posted provide comb air per chap 7 3/3/2003 10:43:12 AM
|
Pressure Test | 3/3/2003 | 3/3/2003 | 3/3/2003 | A | PASS |
Tom Arcoraci
|
|
|
|
Application received | | | 2/24/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 2/24/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/24/2003 | | DONE |
|
|
|
|