Final | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 3/24/2004 2:29:48 PM
|
PostCard Mailed | | | 2/19/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Final | 8/8/2003 | 8/11/2003 | 8/11/2003 | A | PASS |
Dave Lightfoot
|
|
|
Per Dave lightfoot (337)
|
Final | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 9:28:46 AM. Contact: ###-####. Out of time Dixie left work,sbrian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. needs to bolted to the floor as per installation instructions.ent to me at 3:00pm. 8/8/2003 5:28:26 PM
|
Rough-in | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/20/2003 at 8:17:09 AM. Contact: ###-####.
|
Application received | | | 6/12/2003 | | PASS |
|
|
|
Per Dave Lightfoot (337)
|
Issue & PRINT permit | | | 6/12/2003 | | DONE |
|
|
|
|