Pressure Test | 10/6/2003 | 10/7/2003 | 10/7/2003 | A | PASS |
Dixie Fellows
|
|
|
IF LOCKED KEY IS ABOVE DOOR,OR CALL FOR ACCESS.; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
|
DOC - Permit Finaled | 10/7/2003 | 10/7/2003 | 10/7/2003 | A | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 10/7/2003 10:06:19 AM
|
DOC - Permit Finaled | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 10/6/2003 4:10:38 PM
|
Pressure Test | 10/3/2003 | 10/6/2003 | 10/6/2003 | P | FAIL |
Dixie Fellows
|
|
|
thank you; Phone #: ###-#### Internet Inspection Request from: Becky Sucher doors locked...$44.10 reinspection fee 10/6/2003 1:00:29 PM
|
Pressure Test | 10/3/2003 | 10/6/2003 | 10/6/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### Jackie (please call for access)
|
Pressure Test | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 11:55:17 AM. Contact: ###-####. still has a leak..$44.10 reinspection fee 10/3/2003 12:42:02 PM
|
Pressure Test | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | FAIL |
Dixie Fellows
|
|
|
HOME WILL BE UNLOCKED,ITS EMPTY; Phone #: ###-#### Internet Inspection Request from: Becky Sucher gas test failed 10/2/2003 11:51:50 AM
|
Pressure Test | 9/30/2003 | 10/1/2003 | 10/1/2003 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 1:47:54 PM. Contact: ###-####.--call 1st before insp ..off hampton to lupine 10/1/2003 1:11:26 PM door locked 10/1/2003 3:37:12 PM
|
Application received | | | 9/30/2003 | | |
|
|
|
|
Issue permit | | | 9/30/2003 | | DONE |
|
|
|
|