Final | 8/11/2004 | 8/12/2004 | 8/12/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 4:01:42 PM. Contact: ###-####.
|
DOC - Permit Finaled | 8/12/2004 | 8/12/2004 | 8/12/2004 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 8/12/2004 3:27:38 PM
|
PostCard Mailed | | | 8/4/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Rough-in | 11/6/2003 | 11/6/2003 | 11/6/2003 | P | PART |
Alan Hauser
|
|
|
not finished with bath fans, remove tape at s.a. wall stack and seal with mastic, no gas inspection 11/6/2003 4:34:28 PM
|
Rough-in | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | FAIL |
Jim Storey
|
|
|
###-#### Donna ###-#### Donna 15 lbs. 10/24/2003 11:03:58 AM
|
Final | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | NR |
Jim Storey
|
|
|
###-#### Donna
|
Pressure Test | 10/24/2003 | 10/24/2003 | 10/24/2003 | P | PASS |
Jim Storey
|
|
|
###-#### ted
|
Pressure Test | 10/23/2003 | 10/23/2003 | 10/23/2003 | A | CANC |
Jim Storey
|
|
|
out of time rolled. 10/23/2003 4:50:47 PM
|
Final | 10/23/2003 | 10/23/2003 | 10/23/2003 | A | CANC |
Jim Storey
|
|
|
###-#### Donna out of time rolled 10/23/2003 4:51:04 PM
|
Application received | | | 10/23/2003 | | |
|
|
|
|
Issue permit | | | 10/23/2003 | | DONE |
|
|
|
|