Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberMEC03-03578
StatusFinaled
Name ADVANCED HEATING & COOLING
Site Address 1755 N LINDA VISTA LN
Project NameDogwood Plaza
Customer Number 
ePlanReview 
Description
Install heating, cooling unit, split units with duct work, install exhaust fans and dampers. $148,831.00 per initial cert of value.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/21/20046/21/20046/21/2004 DONE
Final approved per Dixie
DOC - Permit Finaled  6/21/2004 DONE
Final5/19/20045/19/20045/19/2004PPART
DetailsDixie Fellows
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson gave advanced temp final...waiting on plumbers and gas w/h's 5/19/2004 1:54:57 PM
Final5/14/20045/17/20045/17/2004AFAIL
DetailsDixie Fellows
###-#### called jeff and left message to meet me at job...no return call 5/17/2004 3:50:53 PM
Final5/13/20045/14/20045/14/2004PCANC
DetailsDixie Fellows
Please note that this is a final on the entire project.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson rescheduled for monday...called gary 5/14/2004 5:26:50 PM
Final5/3/20045/4/20045/4/2004AFAIL
DetailsTroy James
This is a final on the first floor corridor only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Need to install access cover to smoke damper closer to damper in order to reach damper inside. North mechanical room. Ok to drop tiles in corridor 1 st floor. 5/4/2004 10:19:36 AM 5/4/2004 10:20:00 AM
Rough-in4/12/20044/12/20044/12/2004PPASS
DetailsDixie Fellows
This is for the 2nd floor only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson 2nd floor diffusers and 3rd floor s/f dampers ok 4/12/2004 2:52:34 PM
Rough-in3/31/20044/1/20044/1/2004PFAIL
DetailsTroy James
This is a partial RI on the 2nd & 3rd floor corridors only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Incorrect 1 hour assembly at corridor north wing and furnace room. Also need additional fire/smoke damper where duct penetrates 1 hour assembly. 4/1/2004 3:03:23 PM
Conference2/16/20042/17/20042/17/2004APART
DetailsJim Sly
Please contact Jeff Stone Project Manager to coordinate the time for this conference. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Dixie, me and HVAC contr talked about install of fire dampers @ 3rd floor ceiling. 2/17/2004 11:19:14 AM
Rough-in2/10/20042/11/20042/11/2004APASS
DetailsDixie Fellows
Please note this is for the 2nd floor only.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson 2nd floor ok 2/11/2004 12:20:52 PM
Conference2/4/20042/5/20042/5/2004APASS
DetailsDixie Fellows
###-#### chuck s/f dampers in hallway feuip rooms 2/5/2004 10:23:26 AM
Rough-in1/15/20041/16/20041/16/2004APART
DetailsDixie Fellows
Please note that this is for a partial rough-in for the third floor only.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Conference1/7/20041/8/20041/8/2004APART
DetailsJim Sly
Please call Jennifer with the exact time of this conference inspection. Thanks.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Talked about fire dampers at third floor ceiling. 1/8/2004 12:05:52 PM
Conference12/16/200312/17/200312/17/2003APASS
DetailsJim Sly
Chuck ###-#### Met with super, HVAC contr and Dixie....... 12/17/2003 9:53:41 AM
Conference12/16/200312/17/200312/17/2003APASS
DetailsDixie Fellows
Sarah; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Conference12/15/200312/16/200312/16/2003AFAIL
DetailsDixie Fellows
If this could take mid morning that would be great. If you have questions please contact Jennifer.; Phone #: ###-#### Internet Inspection Request from: Debbie Rapp not able to connect today...will meet billy wed am at 8:30 12/16/2003 10:44:58 AM
Application received  12/12/2003  
Issue permit  12/12/2003 DONE