Final | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/19/2004 at 8:31:31 AM. Contact: ###-####...off state to lander 2/19/2004 1:02:06 PM
|
DOC - Permit Finaled | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 2/19/2004 4:54:49 PM
|
Rough-in | 1/12/2004 | 1/13/2004 | 1/13/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 4:03:32 PM. Contact: ###-####.
|
Rough-in | 1/12/2004 | 1/12/2004 | 1/12/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 9:24:56 AM. Contact: ###-####. Contractor changed from 80% furnace to 90%. Still problems with horizontal B-Vent for water heater. 1/12/2004 2:34:29 PM
|
Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 | A | DONE |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 4:01:41 PM. Contact: ###-####.
|
Rough-in | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | FAIL |
Dixie Fellows
|
|
|
correction not done 1/7/2004 4:13:30 PM
|
Rough-in | 1/6/2004 | 1/6/2004 | 1/6/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 8:33:23 AM. Contact: ###-####...off state on lander 1/6/2004 1:03:13 PM no horizontal allowed in b-vent on left unit...right unit ok 1/6/2004 2:45:02 PM
|
Pressure Test | 1/6/2004 | 1/6/2004 | 1/6/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 8:33:56 AM. Contact: ###-####. gas test on both units ok..tag on furnace 1/6/2004 2:45:18 PM
|
Application received | | | 12/23/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 12/23/2003 | | DONE |
|
|
|
|