Final | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/25/2004 at 8:32:25 AM. Contact: ###-####.
|
DOC - Permit Finaled | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 5/25/2004 2:49:34 PM
|
Final | 5/20/2004 | 5/20/2004 | 5/20/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 8:39:03 AM. Contact: ###-####. code for garage didn't work...called lindsey 5/20/2004 4:26:43 PM
|
Pressure Test | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | PASS |
Dixie Fellows
|
|
|
re-insp- lindsey- ###-####
|
Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 6:20:26 PM. Contact: ###-####. Gas test still has not been completed reinspection fee is due 44.10.4/27/2004 9:45:00 AM 4/27/2004 9:45:48 AM
|
Pressure Test | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 6:20:48 PM. Contact: ###-####. Previouse correction has not been resolved. Reinspection fee 44.10 is required. 4/27/2004 9:44:14 AM
|
Rough-in | 4/23/2004 | 4/26/2004 | 4/26/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/23/2004 at 9:14:40 AM. Contact: ###-####.
|
Pressure Test | 4/23/2004 | 4/26/2004 | 4/26/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/23/2004 at 9:15:07 AM. Contact: ###-####. Gas guage does not bottom to zero. Install new guage and retest system. C/N posted on furnace.4/26/2004 10:55:28 AM 4/26/2004 10:55:56 AM
|
Application received | | | 4/21/2004 | | |
|
|
|
|
Issue permit | | | 4/21/2004 | | DONE |
|
|
|
|