Final | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 10/6/2004 at 7:25:42 PM. Contact: ###-####.
|
DOC - Permit Finaled | 10/7/2004 | 10/7/2004 | 10/7/2004 | A | PASS |
Lane Manuel
|
|
|
Finaled by inspector at 10/7/2004 10:22:45 AM
|
Rough-in | 8/23/2004 | 8/23/2004 | 8/23/2004 | P | PASS |
Lane Manuel
|
|
|
###-#### todd
duct,and venting ok, no fau/ or a/c unit @ time of rough insp. 8/23/2004 2:56:56 PM
|
Pressure Test | 8/23/2004 | 8/23/2004 | 8/23/2004 | P | PASS |
Lane Manuel
|
|
|
###-#### todd
27 psi @ time of insp. 8/23/2004 2:55:49 PM
|
Issue permit | | | 8/23/2004 | | DONE |
|
|
|
|
Application received | | | 8/23/2004 | | |
|
|
|
|