Final | 11/10/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### x111 Internet Inspection Request from: Veronica England
|
DOC - Permit Finaled | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 11/12/2004 2:44:31 PM
|
Pressure Test | 9/17/2004 | 9/20/2004 | 9/20/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/17/2004 at 1:44:32 PM. Contact: ###-####.
gas test x 4- units 101-104 all between 24-26psi 9/20/2004 11:13:13 AM
|
Pressure Test | 9/17/2004 | 9/17/2004 | 9/17/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/17/2004 at 10:00:26 AM. Contact: ###-####. guages pegged..called rocky 9/17/2004 2:18:51 PM
|
Rough-in | 9/14/2004 | 9/15/2004 | 9/15/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/14/2004 at 2:26:10 PM. Contact: ###-####.
|
Pressure Test | 9/14/2004 | 9/15/2004 | 9/15/2004 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/14/2004 at 2:26:32 PM. Contact: ###-####. 2 tests failed 9/15/2004 2:59:29 PM
|
Application received | | | 8/24/2004 | | |
|
|
|
|
Issue permit | | | 8/24/2004 | | DONE |
|
|
|
|