Final | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | PASS |
Dixie Fellows
|
|
|
Laura Zane; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
DOC - Permit Finaled | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 3/1/2005 4:46:36 PM
|
Rough-in | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | PASS |
Troy James
|
|
|
LAURA; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
unable to verify, sheetrock installed, called intermountain to verify the work was scheduled to be completed. 11/15/2004 9:38:27 AM
|
Rough-in | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | FAIL |
Dixie Fellows
|
|
|
tosha..these 2 f/p need shields in the attic 9/29/2004 4:57:47 PM
|
Final | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 8:35:14 AM. Contact: ###-####.
rough-in only ok 9/28/2004 3:11:10 PM
|
Application received | | | 9/15/2004 | | |
|
|
|
|
Issue permit | | | 9/15/2004 | | DONE |
|
|
|
|